My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2015 Council Packet
>
City Council Packets
>
2010-2019
>
2015
>
08-26-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 3:51:37 PM
Creation date
8/21/2015 3:48:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kathy Glanzer <br />Sent: <br />To: <br />Subject: <br />Attachments: <br />Next agenda — consent. <br />Joel Hanson <br />Monday, August 1T2OIS3|3UPK4 <br />Kathy Glanzer <br />FW: Quote for fiber at LittIe Canada Firestation <br />MTG Proposal CLC 08-1715.pdf <br />From: Terrence Heiser <br />Sent: Monday, August 17 2015 11:30 AM <br />To: Bill D|rcks|Joel Hanson <br />Subject: FW: Quote for fiber at Little Canada Firestation <br />Bill/Joel, <br />With the fiber to the fire station and public works expected to be completed this week I wanted to remind you that we <br />still need to modify the indoor cabling at the fire station to extend the outdoor fiber up to the second floor data closet. <br />The public works building did not require an extension since the outdoor fiber entered the building within a few feet of <br />the building entrance pipe. This is not the case for the fire station. You need to get from the storage room on the ground <br />floor (back of the apparatus bay) through the bay, up to the second floor and into the utility room. <br />Attached is a proposal from MTG. They were the contractor that worked on the cabling for the public works garage. The <br />time and material cost is reasonable and is similar to the public works wiring job where MTG came in as low bid. <br />I expect that we can get the public works building on network this week. The fire station can be finished once the indoor <br />cabling needs are completed. <br />Terre <br />From: Rod 8pahn[moUto:vod.spehn@cmUntg.00m] <br />Sent: Monday, August 17, 2015 7:19 AM <br />To: Terrence Heiser <network,managercityofroseviIIe.com> <br />Cc: Rod Spohn<nod.spehn@oa||mtg.com> <br />Subject: Quote for fiber at Little Canada Firestation <br />Terre, <br />Here you go, we could get this in later this week. <br />Rod <br />ROD SPAM | PROJECT MANAGER DATA -DIVISION <br />d952.808.3^4% 1 c952.451.8622 1 r952.9412704 <br />md.opehn<aca||mtg.mm <br />r"- <br />Master Technology Group <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.