Laserfiche WebLink
Rink #2 Repaint: It's actually not re -painting but rather two of the walls will be blasted with <br />recycled bulbs to remove the graffiti that has built up on them over the years. Fresh Blast is the <br />name of the company that will be doing the work and if it works it will be a good option for <br />other buildings hit with graffiti in the future. (General Capital Improvement Fund) <br />Rondeau Park Basketball Court Resurfacing: This court was scheduled to be resurfaced in <br />2018 but groundwater and storm runoff problems have caused it to deteriorate earlier than <br />originally planned. Staff is proposing to install drain tile around the south, west, and north sides <br />of the court perimeter to capture as much water as possible before it runs across the court. The <br />southern third of the court has been damaged by the water to the point where resurfacing it will <br />not help. It needs to be completely removed and re -paved. The thought is the drain tile will <br />prevent it from failing in the future. The City Engineer estimates this extra work will cost <br />$7000, bringing the total amount budgeted to $10,000 in 2016. (General Capital Improvement <br />Fund) <br />Thunder Bay Court Resurfacing: This court has also worn out faster than expected and since <br />three other courts are being resurfaced staff is proposing to move it into 2016 as well to gain <br />some economies of scale. (General Capital Improvement Fund) <br />Special Projects — ICWC: Staff has utilized the ICWC prison crews a lot this summer and sees <br />the need to continue using them in the years moving forward. They are invaluable for tree <br />trimming and other large-scale jobs. They have also been able to accomplish jobs in hard to <br />reach areas in lieu of bringing in equipment and causing further damage. Since staff doesn't <br />always have work for them, particularly in the winter, the Friday overtime day is used rather than <br />getting a regular crew one day a week. We tried that in the past and had trouble keeping them <br />busy. It costs $675 for 8-10 workers and a supervisor for a full day. Staff has added a line item <br />to the capital budget for this crew in the amount of $10,000. That equates to about 14 days per <br />year, which should be in line with our usage of the crew. (General Capital Improvement <br />Fund) <br />Security Cameras: Now that fiber line has been run to most of the City's buildings it is feasible <br />to install security cameras at buildings and areas that warrant their use. The new public works <br />facility has cameras installed and they provide a very crisp and clear view of the perimeter of the <br />shop. Pioneer Park had some problems with windows being broken and the vendor area gate <br />being pried open. Staff worked with Roseville IT to get a bid to install cameras at the building in <br />the center of the softball fields. The total bid was $10,900. It was then decided that staff should <br />look at other potential locations for cameras and work with Roseville IT to get pricing for more <br />buildings. Other potential locations are City Hall, The Old Fire Hall, the Skateboard Park, Rink <br />#2 on Demont, the basketball and tennis courts at Pioneer Park, the Spooner Park upper and <br />lower shelters, and the Spooner Park garage that was recently broken into. Not all locations will <br />work due to technological reasons but many of them will work. Staff has budgeted $50,000 for <br />this work in 2016 and will figure out the most optimal locations and present them to the City <br />Council at a later meeting. (General Capital Improvement Fund) <br />200 kW Generator: This has been added as a split cost between the public works capital budget <br />and the sewer and water capital budget since it will be used to power lift stations and the booster <br />4 <br />