Laserfiche WebLink
Bill Dircks <br />From: <br />Sam Roberto esamrobertosc@hotmail,com> <br />Sent: <br />Wednesday, September 02, 2015 9:08 PM <br />To: <br />Joel Nanson <br />Cc: <br />Rill Dircks <br />Subject: <br />808 savage <br />Joel, As requested I am following up today's walk down of my property with an emall, our discussion/wall<down <br />Included review of the area to be graded, tree removal and that the line of several Cottonwood trees/brush at the <br />center of ROW (directly north of 298 Rose) Is not in scope, It was discussed that this project could have 2 phases, the <br />second phase in the future could Include replacement of the referenced cotton wood trees with a different type, Any <br />second phase would be separate and discussed with the City. <br />You Indicated the discussed tree removal can proceed. <br />Sam <br />