My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-2015 Council Packet
>
City Council Packets
>
2010-2019
>
2015
>
11-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2015 4:02:20 PM
Creation date
11/23/2015 3:47:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"�ZkL <br />l>f <br />:A A Document1TM 1 <br />Change Order <br />PROJECT (Name and address): CHANGE ORDER NUMBER: 7-1, OWNER: d <br />City of Little Canada City liall DATE: 10/26/2015 ARCHITECT: ❑ <br />51.5 Little Canada Road bast <br />Little Canada, NM 55117 CONTRACTOR: ❑ <br />TO CONTRACTOR (Alarne and address): ARCHITECT'S PROJECT NUMBER: FIELD: James Steele Construction Company CONTRACT DATE: 12/3/2014 <br />1410 Sylvan Street CONTRACT FOR: General Construction OTHER: ❑ <br />St. Paul, MN 55117 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, lvhere applicable, anv undis1wiled amount attributable tp prevlously executed Constrctction Change Directives) <br />Add Stone Enhanser to new stone work in Council Chambers, ADD 585.00 <br />Additional plumbing work related to the replacement of the countertops, ADD $799.00 <br />Additional supervision and labor required per Changes in work, ADD $3,747.00 <br />The original Contract Suniwas $ <br />188,810.00 <br />The net change by previausty authorized Change Orders $ <br />35,679.00 <br />The Contract Sum prior to this Change Order was $ <br />224,489.00 <br />The Contract Stmt will be increased by this Change Order in the amount of $ <br />5.131.00 <br />The new Contract Sum including this Change Order will be $ <br />229,620.00 <br />The Contract Time will be increased by Zero (0) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />NOTE: This Change Order docs not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have <br />been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, <br />Oertel Architects James Steele Construction Company City of Little Canada <br />ARCHITECT (firm name) CONTRACTOR (I <rnt name) OWNER (P'irm name) <br />1795 Saint Clair Avenue 1410 Sylvan Street 515 Little Canada Road Fast <br />St. Paul, NIN 55105 St, Paul,MN 55117 4 1.1ttle Canada, MN 55117 <br />ADDRESS ADD ,ADDRESS <br />BY (Signature) BY (. grata r BY (Signature) <br />('l))ped name) <br />DATE <br />R.J. Naughton, President <br />(7))ped name) (7)y)ed name) <br />DATE <br />DATE <br />AIA Document G701111 — 2001, Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA" <br />Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAO Document, or any <br />portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This documentwas <br />produced by AIA software at 12:55:07 on 10/26/2015 under Order No.6509610431 1 which expires on 03117/2016, and is not for resale. <br />User Notes:(1498,142359) <br />
The URL can be used to link to this page
Your browser does not support the video tag.