My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-04-2003 Parks Commission Agenda
>
Agenda Packets
>
2000-2009
>
2003
>
09-04-2003 Parks Commission Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2008 1:12:40 PM
Creation date
7/22/2008 1:10:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LITTLE CANADA TRAIL PROJECTS <br />October 24, 2000 <br />Revised: October 3, 2002 <br />Revised: Apri14, 2003 <br />PROJECT ESTIMATED COSTS <br />AC UISITION DEVELOPMENT <br /> t Unit Cost Total <br />1. Power Line Trail <br />a. Westwinds to Ma le Leaf Court 0 2000 If $27.00 $54 000.00 <br />2. Jackson Street Trail <br />a. Little Canada Road to Waterworks Trail 0 800 if $27.00 $21,600.00 <br />3. Desnto Street Trail <br />a. Phase I - LaBore to Allen 0 1000 if $27.00 $27 000.00 <br />b. Phase 2 -Allen to Centerville 1500 if $27.00 $40 500.00 <br />4. Power Line Trail <br />a.. Pa ne Avenue to Desoto 4000 sf $3 = $12 000 2000 if $27.00 $54 000.00 <br />b. Tunnel under Ed erton Street 0 80 if $1 500.00 $120 000.001 <br />5. Centerville Road <br />a. Pioneer Park to Ed erton to Pa ne 5000 If $27.00 $135 000.001 <br />b. Spooner Park to Pioneer Park Schedule contingent on <br />Centerville Road <br />Im rovement 1500 (f $27.00 $40,500.00', <br /> <br />'~ <br />6. Waterworks Trail I <br />a. South Owasso to North Owasso (on 0 5000 If $27.00 $135 000.001 <br />grade crossings of RR tracks and South <br />Owas o <br />7. Middle School Trail <br />a. Jackson/Demont to County Road B2 On school district <br />ro ei 1500 if $27.00 $40,500.00 <br />8. Rice Street Trail <br />a. North Owasso to South Owasso Possible addl ROW 4000 ]f $27.00 $108 000.00 <br />b. South Owasso to Little Canada Road Possible addl ROW 2000 If $27.00 $54 000.00 <br />c. Little Canada Road to Vikin Drive Possible addl ROW 5000 if $27.00 $135 000.00 <br />9. Gervais Creek Trail Re lacement <br />a. Noel Drive to Centerville Road 0 2000 if $27.00 $54 000.00 <br />10. Vadnais Boulevard Trail <br />a. Alon Pratt Develo ment 0 700 ]f $27.00 $18 900.001 <br /> <br />TOTAL DEVELOPMENT COST $1 038 000.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.