Laserfiche WebLink
FROM :NRC <br />FRX N0. :9525959837 <br />Jun. 04 2003 03:44PM P9igg <br />should be Gear about both full-development improvements and interim development <br />improvements. The plans do not suggest what the interim improvements will be. <br />will typically include landscape cover. in areas of future bui(din s or <br />interim improvements that will need to be altered when full development occurs. U'mese <br />these items are finalized, planning staff can not recommend Develo~rking late, and any <br />approve-• The Preliminary plat may be ready for approval from a planning stagdpo nD <br />however, the ertginear has other questions related to drainage and utilities that wilt <br />affect plat easements and other issues. <br />If the City wishes to allow the Preliminary plat and Development Stage PUD to proceed, <br />staff would recommend the following conditions: <br />1 • Preparation of revised plat and PUD plans detailin <br />improvements: paving, curbing, buildings, landscapi g' s~d walks etc. <br />2• Preparation of revised plat and PUD <br />that are being proposed pendin plans detailing sue//interim improvements <br />"future" on the plan, as a g the development of those <br />3. Compliance with the reoopad of a PUD phasing plan. areas labeled <br />engineer's comments. mmendations made in this re o , <br />"4• Concept PUp a P rt as welt as the <br />pproval only should be considered for Lot 1 <br />defined development plan, peveto <br />the "future" Ppr°~a- should be <br />considered for Lot 2 and Lok 3 wit phe u derstanding that development of <br />~'' ?he +'amninguodih~ ~ f °t 3 will require an amendment tc the final PUD. <br />u h portion of the.ptiypeny (Lot 3 sho <br />~e time of final plat approval. <br />wld occur ohly at <br />pc: Kathy Glanzer <br />.Steve Westerhaus <br />Lee Elfering~ <br />13teg Schroeder <br />Cart Johpson,'L7rywall Supply, 5421 Quam q,Ve, NE, S~.'l~ltchael, ~ '55874 <br />ao- <br />