My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2016 Council Packet
>
City Council Packets
>
2010-2019
>
2016
>
03-09-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:18 AM
Creation date
3/10/2016 9:18:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10062 Flanders Court NE – Blaine, MN 55449 – (763) 780-0450 fax (763) 780-0452 <br /> <br />Z:\PROJ\120190E - 2016 Street Improvements\0060\Memo-030316-CC (authorize bids).doc <br /> <br /> <br />Memo <br /> <br /> <br /> <br />TO: Mayor Keis & Members of the City Council <br /> <br />FROM: Lee Elfering, City Engineer <br /> <br />DATE: March 3, 2016 <br /> <br />RE: 2016 Street and Utility Improvements <br /> Approval of Plans & Authorization for Advertising <br /> <br /> <br />As directed by the City Council we have prepared plans and specifications for the 2016 <br />Street and Utility Improvements Project. The streets included for rehabilitation include: <br /> <br /> Aspen Circle (County Road D to County Road D) <br /> Morrison Street (Demont to the south end) <br /> Demont Avenue (McMenemy Street to Savage Lane) <br /> <br />As directed at the public hearing the project will include the removal and replacement of <br />the concrete curb and gutter in front of each driveway on all these streets and sufficient <br />driveway replacement to allow for an improved driveway access. In addition to the street <br />work minor utility repairs and improvements will be completed on all streets. Also <br />included in the plans are some minor watermain repairs and bituminous work in other <br />areas around the City to capitalize on the more competitive pricing that is received on <br />larger projects. <br /> <br />As the City Council is aware, a concern at the public hearing was the possibility of heavy <br />construction traffic from the upcoming Mn/DOT sound wall work on Demont Avenue and <br />Morrison Street after the improvement was completed. Residents were concerned that <br />construction traffic would damage the street shortly after the street work was completed. <br />We have worked with Mn/DOT on this issue and their contract now allows the wall <br />contractor to utilize Demont Avenue for access until July 31, 2016. After that date they <br />would need written approval from the City for using Demont Avenue which would allow <br />us to control construction traffic use. <br /> <br />At this time we are requesting plan approval and authorization for advertisement for bids <br />from the City Council. <br /> <br />If you have any questions please call me at (763) 780-0450 extension 3.
The URL can be used to link to this page
Your browser does not support the video tag.