My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-25-2016 Workshop Packet
>
City Council Packets
>
2010-2019
>
2016
>
05-25-2016 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:18 AM
Creation date
6/13/2016 11:13:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prepared by BKV Group, Commission No. 1164.06 1 <br />Existing Conditions Assessment <br />Site <br />Existing asphalt is in excellent condition. Sidewalk along Centerville Road is growing weeds in cracks <br />and does not have truncated domes at the curb cut to the fire station parking lot. The public parking <br />lot has been restriped to meet current accessible standards, but the sidewalk has not been modified <br />to relocate the curb ramp. Some subsidence of sidewalk areas along east side of apparatus bays, and <br />no truncated domes present where sidewalks meet drive aisles. Concrete aprons are pulling away <br />from building leaving large unsealed gap. Bollards rusting at the base and need painting. Landscape is <br />in excellent condition but trees have grown so large they block building-mounted signage, which <br />impedes wayfinding. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.