Laserfiche WebLink
Prepared by BKV Group, Commission No. 1164.06 11 <br />Project Goals <br />1. Update kitchen with new appliances, fixtures, and cabinetry that meet current codes and <br />energy/water use standards. Resolved in Phase 1. <br />2. Replace aging overhead doors to provide better visibility and modern safety provisions. <br />Resolved in Phase 2. <br />3. Provide a hand-wash sink in the apparatus bays to improve infection control and <br />decontamination Resolved in Phase 2. <br />4. Replace turnout gear lockers with a system that facilitates proper drying. Resolved in Phase 2. <br />5. Provide heated apron and sidewalk areas to improve winter response times. Resolved in Phase <br />2. <br />6. Provide a vehicle wash location that prevents turnout gear from getting wet. Resolved in Phases <br />2 and 4. <br />7. Provide sufficient parking for training events and large emergencies. Resolved in Phase 3. <br />8. Provide a second drive-through apparatus bay to better accommodate current apparatus load. <br />Resolved in Phase 4. <br />9. Provide five offices and two conference rooms. Resolved in Phase 5. <br />10. Plan for a future elevator to provide access to the second floor. Resolved in Phase 5. <br />11. Improve exterior wayfinding to help the public find the main entrance. Resolved in Phase 5. <br />12. Increase storage areas to support the current and future needs. Resolved in Phase 5. <br />13. Enlarge the training room to accommodate 50 seats. Resolved in Phase 6. <br />14. Replace aging mechanical systems to reduce maintenance costs and improve energy efficiency. <br />Resolved in Phases 6 and 7. <br />15. Update restrooms and shower rooms to eliminate leaks, meet current accessibility and building <br />codes, and reduce energy/water use to current standards. Resolved in Phase 7. <br />16. Provide three dorm rooms to accommodate staff on overnight shifts. Resolved in Phase 7. <br />17. Provide emergency generator for full station backup power. Resolved in Phase 8. <br />