Laserfiche WebLink
ITEM <br />NO. ITEM DESCRIPTION UNIT QTY.UNIT PRICE QTY.TOTAL PRICE QTY.TOTAL PRICE <br />ORIGINAL CONTRACT THIS PERIOD TOTAL TO DATE <br />25 2531.618 TRUNCATED DOMES SF 8.00 $36.50 0.00 $0.00 12.00 $438.00 <br />26 2540.602 INSTALL MONUMENT EACH 1.00 $1,125.00 0.00 $0.00 0.00 $0.00 <br />27 2540.602 INSTALL SALVAGED MAILBOXES EACH 13.00 $105.00 0.00 $0.00 0.00 $0.00 <br />28 2540.602 INSTALL SALVAGED LIGHT EACH 1.00 $1,300.00 0.00 $0.00 0.00 $0.00 <br />29 2541.602 INSTALL SALVAGED MODULAR BLOCK WALL SF 20.00 $20.00 0.00 $0.00 12.30 $246.00 <br />30 2575.505 SODDING TYPE SALT RESISTANT SY 1,070.00 $3.25 0.00 $0.00 697.00 $2,265.25 <br />SCHEDULE 3.0 - SUPPLEMENTAL #1 SIDEWALK ADDITION -- TOTAL $0.00 $85,649.70 <br />SCHEDULE 4.0 - SUPPLEMENTAL #2 LITTLE CANADA BRIDGE SIGNAL AND STRIPING <br />1 2021.501 MOBILIZATION LS 1.00 $3,500.00 0.00 $0.00 1.00 $3,500.00 <br />2 2101.501 PAVEMENT MARKING REMOVAL SF 1,147.00 $2.65 0.00 $0.00 1147.00 $3,039.55 <br />3 2101.502 PAVEMENT MARKING REMOVAL LF 1,660.00 $0.90 0.00 $0.00 1660.00 $1,494.00 <br />4 2563.601 TRAFFIC CONTROL LS 1.00 $4,025.00 0.00 $0.00 1.00 $4,025.00 <br />5 2565.616 REVISED TRAFFIC CONTROL SIGNAL SYSTEM A EACH 1.00 $8,500.00 0.00 $0.00 1.00 $8,500.00 <br />6 2565.616 REVISED TRAFFIC CONTROL SIGNAL SYSTEM B EACH 1.00 $8,100.00 0.00 $0.00 1.00 $8,100.00 <br />7 2582.501 PAVT MESSAGE (LT ARROW)EACH 2.00 $150.00 0.00 $0.00 2.00 $300.00 <br />8 2582.501 PAVT MESSAGE (RT ARROW)EACH 1.00 $150.00 0.00 $0.00 1.00 $150.00 <br />9 2582.502 4" SOLID LINE WHITE - EPOXY LF 1,299.00 $0.30 0.00 $0.00 1299.00 $389.70 <br />10 2582.502 4" BROKEN LINE WHITE - EPOXY LF 199.00 $0.30 0.00 $0.00 199.00 $59.70 <br />11 2582.502 4" SOLID DOUBLE LINE YELLOW - EPOXY LF 650.00 $0.55 0.00 $0.00 650.00 $357.50 <br />12 2582.502 24" STOP LINE WHITE - EPOXY LF 66.00 $9.35 0.00 $0.00 66.00 $617.10 <br />13 2582.503 CROSSWALK MARKING EPOXY SF 195.00 $5.25 0.00 $0.00 195.00 $1,023.75 <br />SCHEDULE 4.0 - SUPPLEMENTAL #2 LITTLE CANADA BRIDGE SIGNAL AND STRIPING -- TOTAL $0.00 $31,556.30 <br />SCHEDULE 5.0 - SUPPLEMENTAL #3 EXTRA WORK ITEMS <br />1 2232.501 MILLING (WINTER RAMPS)LS 1.00 $1,125.00 0.00 $0.00 1.00 $1,125.00 <br />2 2411.602 RECONSTRUCT MASONRY STRUCTURE EACH 3.00 $2,733.14 0.00 $0.00 3.00 $8,199.42 <br />3 2104.602 REPAIR SPRINKLER SYSTEM EACH 1.00 $250.00 0.00 $0.00 1.00 $250.00 <br />4 2563.601 TRAFFIC CONTROL (ADDITIONAL)LS 1.00 $3,500.00 0.00 $0.00 1.00 $3,500.00 <br />5 SPEC TEMPORARY BITUMINOUS RAMP REMOVAL & GRADING LS 1.00 $5,460.00 0.00 $0.00 1.00 $5,460.00 <br />6 SPEC ADDITIONAL SIDEWALK CLEARING, GRUBBING, AND GRADINGLS 1.00 $4,200.00 0.00 $0.00 1.00 $4,200.00 <br />7 SPEC RAINGARDEN GRADING & MODIFICATIONS LS 1.00 $6,300.00 0.00 $0.00 1.00 $6,300.00 <br />SCHEDULE 5.0 - SUPPLEMENTAL #3 EXTRA WORK ITEMS -- TOTAL $0.00 $29,034.42 <br />BID SUMMARY <br />SCHEDULE 1.0 - LITTLE CANADA ROAD -- TOTAL $0.00 $1,062,951.33 <br />ALTERNATE 1.0 - LITTLE CANADA ROAD -- TOTAL $0.00 $29,158.50 <br />SCHEDULE 2.0 - CHANGE ORDERS -- TOTAL $0.00 $52,274.17 <br />SCHEDULE 3.0 - SUPPLEMENTAL #1 SIDEWALK ADDITION -- TOTAL $0.00 $85,649.70 <br />SCHEDULE 4.0 - SUPPLEMENTAL #2 LITTLE CANADA BRIDGE SIGNAL AND STRIPING -- TOTAL $0.00 $31,556.30 <br />SCHEDULE 5.0 - SUPPLEMENTAL #3 EXTRA WORK ITEMS -- TOTAL $0.00 $29,034.42 <br />TOTAL BID SUMMARY THIS PERIOD $0.00 <br />TOTAL BID SUMMARY TO DATE $1,290,624.42 <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE $54,531.22 $54,531.22 <br />$0.00 $0.00 <br />**********************************$1,226,093.20 <br />$0.00 $0.00 <br />$0.00 $1,290,624.42 <br />-$54,531.22 $10,000.00 <br />THIS PERIOD TOTAL TO DATE <br />TOTAL THIS PERIOD TOTAL TO DATE