My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2016 ADDITIONS Packet
>
City Council Packets
>
2010-2019
>
2016
>
08-10-2016 ADDITIONS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:18 AM
Creation date
9/23/2016 5:10:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10062 Flanders Court NE – Blaine, MN 55449 – (763) 780-0450 fax (763) 780-0452 <br /> <br />Z:\PROJ\120200E - Eli Ballfield Trail\Memo-081016-CC (Eli Ballfield Trail Award).doc <br /> <br /> <br /> <br /> <br /> <br />Memo <br /> <br /> <br />TO: Mayor Keis & Members of the City Council <br /> <br />FROM: Lee Elfering, City Engineer <br /> <br />DATE: August 10, 2016 <br /> <br />RE: Eli Ballfield Trail Improvement <br /> <br /> <br />The City’s 2016 budget included $28,000 for the repair/improvement of the Eli ballfield <br />trail behind the Little Canada Elementary School off Eli Road. This bituminous trail is <br />approximately 5 feet in width and 1,300 feet long. Based on a field review of it’s <br />condition the proposed improvement method is similar to the method used on the 5 foot <br />trail in Spooner Park that runs along the driveway to the back parking lots. We are <br />proposing to complete an overlay of the entire trail with small areas of full replacement <br />where necessary. We have obtained quotes from the two Contractors that bid the <br />previous trail work in Spooner Park and the bids are summarized below. <br /> <br /> Contractor Quote <br /> TA Schifsky & Sons $13,925.00 <br /> Buck Blacktop $20,800.00 <br /> <br />Both quotes received were below the budgeted amount and T.A. Schifsky & Sons is the <br />low bidder. They have completed numerous trail and street improvement projects for the <br />City in the past and we would consider them a responsive and responsible bidder. <br /> <br />The trail is located adjacent to the school play fields therefore, we informed both <br />Contractors prior to bidding that the work would need to be completed prior to the <br />beginning of school. At this time we are requesting authorization to award the trail work <br />to T.A. Schifsky & Sons as the low bidder so the work can begin in a timely manner to <br />meet this deadline. If you have any questions please feel free to call me at 763-780- <br />0450 Ext. 3. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.