Laserfiche WebLink
ITEM SPEC. <br />NO. REF.ITEM DESCRIPTION UNIT QTY.UNIT PRICE QTY.TOTAL PRICE QTY.TOTAL PRICE <br />ORIGINAL CONTRACT THIS PERIOD TOTAL TO DATE <br />84 2571.502 DECIDUOUS TREE 2" CAL BR TREE 6.00 $524.71 0.00 $0.00 0.00 $0.00 <br />85 2571.541 TRANSPLANT TREE TREE 10.00 $321.25 0.00 $0.00 0.00 $0.00 <br />86 2573.502 SILT FENCE TYPE MACHINE SLICED LF 8,200.00 $2.09 0.00 $0.00 6560.00 $13,710.40 <br />87 2573.520 SEDIMENT REMOVAL BACKHOE HR 80.00 $192.75 0.00 $0.00 0.00 $0.00 <br />88 2573.53 STORM DRAIN INLET PROTECTION (W/O CASTING)EACH 39.00 $96.38 0.00 $0.00 27.00 $2,602.26 <br />89 2573.53 STORM DRAIN INLET PROTECTION (W/ CASTING)EACH 39.00 $96.38 2.00 $192.76 52.00 $5,011.76 <br />90 2573.602 INLET SEDIMENT REMOVAL EACH 100.00 $0.01 0.00 $0.00 11.00 $0.11 <br />91 2574.525 TOPSOIL BORROW (CV)CY 1,650.00 $21.60 297.00 $6,415.20 837.90 $18,098.64 <br />92 2574.55 COMPOST GRADE 2 CY 200.00 $37.48 0.00 $0.00 0.00 $0.00 <br />93 2575.505 SODDING TYPE LAWN SY 14,500.00 $4.23 0.00 $0.00 3199.00 $13,531.77 <br />94 2575.523 EROSION CONTROL BLANKET, CATEGORY 3P SY 4,240.00 $2.03 0.00 $0.00 42.00 $85.26 <br />95 2575.604 SEEDING (TYPE 25-131)SY 3,350.00 $0.13 0.00 $0.00 0.00 $0.00 <br />96 2575.604 SEEDING (TYPE 33-261)SY 890.00 $1.00 0.00 $0.00 42.00 $42.00 <br />97 2582.501 PAVEMENT MESSAGE EPOXY SF 62.00 $5.91 0.00 $0.00 0.00 $0.00 <br />98 2582.502 4" SOLID LINE EPOXY LF 13,133.00 $0.27 0.00 $0.00 0.00 $0.00 <br />99 2582.502 4" DOUBLE SOLID EPOXY LF 3,575.00 $0.54 0.00 $0.00 0.00 $0.00 <br />100 2582.502 4" BROKEN LINE EPOXY LF 2,500.00 $0.27 0.00 $0.00 0.00 $0.00 <br />101 2582.502 24" STOP LINE EPOXY LF 41.00 $6.96 0.00 $0.00 0.00 $0.00 <br />102 2582.502 CROSSWALK MARKING EPOXY SF 245.00 $4.39 0.00 $0.00 0.00 $0.00 <br />SCHEDULE 3.0 - CENTERVILLE ROAD - TOTAL $148,443.75 $1,582,793.14 <br />SUPPLEMENTAL 1.0 - SELECT GRANULAR BORROW <br />1 2105.522 SELECT GRANULAR BORROW (EV)CY 3,212.40 $33.00 3212.40 $106,009.20 3212.40 $106,009.20 <br />2 2105.604 GEOTEXTILE FABRIC TYPE V SY 4,869.70 $1.60 4869.70 $7,791.52 4869.70 $7,791.52 <br />3 2502.521 4-INCH PERF PE PIPE DRAIN W/SOCK LF 291.00 $3.75 291.00 $1,091.25 291.00 $1,091.25 <br />4 2550.602 CORE DRILLED HOLE EACH 3.00 $550.00 3.00 $1,650.00 3.00 $1,650.00 <br />SUPPLEMENTAL 1.0 - SELECT GRANULAR BORROW - TOTAL $116,541.97 $116,541.97 <br />SUPPLEMENTAL 3.0 - SIDEWALK EXTENSION <br />1 2104.505 REMOVE BITUMINOUS PAVEMENT SY 215.11 $2.35 218.00 $512.30 218.00 $512.30 <br />2 2211.501 AGGREGATE BASE, CLASS 5 (TRAIL AND SIDEWALK)TON 163.50 $19.00 62.17 $1,181.23 62.17 $1,181.23 <br />3 2521.501 4" CONCRETE WALK SF 5,520.00 $3.91 4686.00 $18,322.26 4686.00 $18,322.26 <br />4 2521.501 4" CONCRETE WALK (COLORED)SF 1,240.00 $10.90 963.00 $10,496.70 963.00 $10,496.70 <br />SUPPLEMENTAL 3.0 - SIDEWALK EXTENSION - TOTAL $30,512.49 $30,512.49 <br />SUPPLEMENTAL 4.0 - 16" WATERMAIN OFFSET <br />1 2504.602 WATERMAIN OFFSET EACH 1.00 $19,300.31 1.00 $19,300.31 1.00 $19,300.31 <br />SUPPLEMENTAL 4.0 - 16" WATERMAIN OFFSET - TOTAL $19,300.31 $19,300.31 <br />BID SUMMARY <br />SCHEDULE 1.0 - SOUTH OWASSO BLVD. - TOTAL $6,015.62 $699,565.07 <br />SCHEDULE 2.0 - COUNTRY DRIVE - TOTAL $6,249.59 $664,118.75 <br />SCHEDULE 3.0 - CENTERVILLE ROAD - TOTAL $148,443.75 $1,582,793.14 <br />SUPPLEMENTAL 1.0 - SELECT GRANULAR BORROW - TOTAL $116,541.97 $116,541.97 <br />SUPPLEMENTAL 3.0 - SIDEWALK EXTENSION - TOTAL $30,512.49 $30,512.49 <br />THIS PERIOD TOTAL TO DATE <br />5 of 67