ITEM SPEC.ITEM DESCRIPTION TOTAL UNIT
<br />NO.REF.UNIT QTY PRICE QTY.TOTAL PRICE QTY.TOTAL PRICE
<br />TOTAL TO DATETHIS PERIOD
<br />10 2215.501 FULL DEPTH RECLAMATION (8" FDR)SY 3,900.00 $1.10 3900.00 $4,290.00 3900.00 $4,290.00
<br />11 2232.501 MILL BITUMINOUS SURFACE (1.5")SY 30.00 $10.00 0.00 $0.00 0.00 $0.00
<br />12 2360.501 TYPE SP 9.5 WEARING COURSE MIX. TON 375.00 $65.00 0.00 $0.00 0.00 $0.00
<br />13 2360.502 TYPE SP 12.5 WEARING COURSE MIX. TON 485.00 $64.00 0.00 $0.00 0.00 $0.00
<br />14 2360.501 TYPE SP 9.5 WEARING COURSE MIX. (DRIVEWAY)TON 25.00 $150.00 0.00 $0.00 0.00 $0.00
<br />15 2504.602 16x6 WET TAP W/ VALVE EACH 1.00 $5,092.50 1.00 $5,092.50 1.00 $5,092.50
<br />16 2504.602 INSTALL HYDRANT EACH 1.00 $5,176.50 1.00 $5,176.50 1.00 $5,176.50
<br />17 2504.602 EXPLORATORY DIG "WATERMAIN FITTING"EACH 5.00 $1,827.00 3.00 $5,481.00 3.00 $5,481.00
<br />18 2504.602 "WATERMAIN FITTING" BOLT REPLACEMENT EACH 3.00 $1,081.50 1.00 $1,081.50 1.00 $1,081.50
<br />19 2504.602 ADJUST VALVE EACH 3.00 $399.00 0.00 $0.00 0.00 $0.00
<br />20 2504.603 6-INCH DIP WATERMAIN LF 20.00 $48.30 15.50 $748.65 15.50 $748.65
<br />21 2506.522 ADJUST FRAME, RING, AND CASTING (SANITARY)EACH 5.00 $761.25 0.00 $0.00 5.00 $3,806.25
<br />22 2506.522 ADJUST FRAME, RING, AND CASTING (STORM)EACH 15.00 $300.00 0.00 $0.00 0.00 $0.00
<br />23 2531.501 CONCRETE CURB & GUTTER LF 830.00 $22.26 81.00 $1,803.06 81.00 $1,803.06
<br />24 2563.601 TRAFFIC CONTROL LS 1.00 $6,500.00 0.50 $3,250.00 0.50 $3,250.00
<br />25 2573.530 STORM DRAIN INLET PROTECTION (W/ CASTING)EACH 15.00 $95.00 10.00 $950.00 10.00 $950.00
<br />26 2573.602 INLET SEDIMENT REMOVAL EACH 40.00 $50.00 0.00 $0.00 0.00 $0.00
<br />27 2574.525 TOPSOIL BORROW (CV)CY 15.00 $60.00 0.00 $0.00 0.00 $0.00
<br />28 2575.523 EROSION CONTROL BLANKET, CATEGORY 3P SY 100.00 $2.36 0.00 $0.00 0.00 $0.00
<br />29 2575.604 SEEDING (TYPE 25-151)SY 100.00 $1.05 0.00 $0.00 0.00 $0.00
<br />30 SPEC GRADATION TEST, RECLAIM EACH 1.00 $176.00 0.00 $0.00 0.00 $0.00
<br />31 SPEC PROCTOR TEST, RECLAIM EACH 1.00 $203.50 0.00 $0.00 0.00 $0.00
<br />32 SPEC DENSITY TEST, IN PLACE EACH 6.00 $77.00 0.00 $0.00 0.00 $0.00
<br />33 SPEC CONCRETE TESTING, CYLINDERS (SET OF 3)EACH 2.00 $154.00 1.00 $154.00 1.00 $154.00
<br />34 SPEC NUCLEAR BITUMINOUS DENSITY EACH 12.00 $33.00 0.00 $0.00 0.00 $0.00
<br />35 SPEC EXTRACTION/GRADATION EACH 1.00 $231.00 0.00 $0.00 0.00 $0.00
<br />36 SPEC AIR VOIDS EACH 1.00 $231.00 0.00 $0.00 0.00 $0.00
<br />SCHEDULE 3.0 - MORRISON STREET - TOTAL $42,912.71 $46,718.96
<br />BID SUMMARY
<br />SCHEDULE 1.0 - ASPEN CIRCLE - TOTAL
<br />SCHEDULE 2.0 - DEMONT AVENUE - TOTAL
<br />SCHEDULE 3.0 - MORRISON STREET - TOTAL
<br />TOTAL BID SUMMARY THIS PERIOD
<br />TOTAL BID SUMMARY TO DATE
<br />AMOUNT EARNED
<br />AMOUNT RETAINED
<br />MATERIAL ON SITE
<br />MATERIAL DEDUCT.
<br />PREVIOUS PAYMENTS
<br />AMOUNT DUE
<br />**********************************$84,266.46
<br />$150,346.19 $150,346.19
<br />$0.00 $0.00
<br />$0.00 $0.00
<br />$158,259.15 $246,960.69
<br />$7,912.96 $12,348.03
<br />$42,912.71 $46,718.96
<br />$158,259.15
<br />$246,960.69
<br />TOTAL THIS PERIOD TOTAL TO DATE
<br />THIS PERIOD TOTAL TO DATE
<br />$94,452.94 $176,303.23
<br />$20,893.50 $23,938.50
<br />3
|