My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-2017 Council Packet
>
City Council Packets
>
2010-2019
>
2017
>
07-26-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:07 AM
Creation date
7/31/2017 12:01:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submitted To:Submitted By: <br />Robert Appelhof <br />Cedar Creek Energy Corporation <br />1285 114th Ave NW <br />Coon Rapids, MN 55448 <br />Phone: (763) 432-5261 <br />Date: <br />Proposed Scope of Supply Sales Rep: <br />Proposal Price Payment Terms <br />Proposed Project Schedule <br />Commencement of work is estimated to take place within 90 days of Proposal Agreement ratification. Completion of work is estimated at 30 days following <br />commencement. <br />General Terms and Conditions <br />Terms and Conditions according to Cedar Creek Energy Corp contract, terms of which are hereby incorporated by reference as a part of this proposal. <br />Cancellation <br />Buyer may cancel this transaction by any time prior to midnight of the third business day after the date of this transaction. Seller may withdraw this <br />proposal if not accepted within 30 days. <br />Acceptance <br />The above proposal is satisfactory and hereby accepted. You are authorized to do the work as specified, and payment will be made according to the above <br />terms. <br />Buyer <br />Signature <br />Owner <br />DATE: <br />Seller <br />Signature <br />Robert J. Appelhof <br />President <br />DATE: <br />PROPOSAL <br />AGREEMENT <br />PROPOSAL <br />AGREEMENT <br />City Of Little Canada Public Works <br />2858 Centerville Road <br />Little Canada, MN 55117 <br />Sam <br />39.68 KW (DC), 33.3 KW (AC) Roof Mounted Solar Array: <br />• (124) Heliene 320 Poly <br />• (1) Solar Edge 33.3 KW, 277/480V, 3 Phase Inverter <br />• (62) Solar Edge P700 DC Optimizers <br />• Solar Edge Web Based Module Level Monitoring, 2 to 1 <br />• Unirac Aluminum Roof Racking <br />• Wire, Conduit, and Disconnects <br />• Labor <br />• Rebate Application <br />• Electrical Permit, Building Permit to be pulled by CCE and billed to customer at cost. Not included in total price. <br />**Contingent Upon Lottery Award and final Client approval <br />$117,500.00 <br />TBD <br />02/27/2017 <br />02/27/2017 <br />02/27/2017 <br />Doc ID: 91729af6c91298333cdb4b99efc10a5ce5756742
The URL can be used to link to this page
Your browser does not support the video tag.