Laserfiche WebLink
Estimated total project cost is $31.1 million <br />Construction = $17.0 m <br />Right-of-way (ROW) acquisition = $10.1 m <br />Design & construction engineering = $4.0 m <br />Funding <br />2017 State Legislative funds = $20.5 m <br />Federal funds = $7.0 m <br />County funds = $2.0 m (CSAH/CTB eligible) <br />City funds = $1.6 m (MSA eligible) <br />MnDOT funds = TBD <br />Costs & Funding