My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-2018 Special Council Minutes (Imp. Hearing)
>
City Council Meeting Minutes
>
2010-2019
>
2018
>
02-12-2018 Special Council Minutes (Imp. Hearing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 11:57:02 AM
Creation date
3/6/2018 11:56:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL SPECIAL MEETING <br />FEBRUARY 12, 2018 <br />awarded, construction commences and typically after substantial <br />completion of the project, an assessment hearing is held. <br />The City Engineer then explained the assessment hearing process. At that <br />hearing, which is typically in October, property owners have the <br />opportunity to voice opinions on the proposed assessments. The Council <br />would act on any objections received and then approve the assessments. <br />The assessment amounts can be paid within 30 days with no interest <br />charged, otherwise they will be assessed to property taxes for a period of <br />10 years with an interest rate of approximately 4.5%, depending on the <br />bond rates. Interest accrues from the date the assessments are adopted for <br />those certified to property taxes. The assessments can be paid off at any <br />time. <br />The City Engineer provided information about the condition of Park View <br />Court that resulted in the proposed improvement. He stated that he is <br />proposing the street be improved by mill & overlay with curb replacement. <br />The City Engineer then reviewed the construction process in detail. He <br />noted that the City installs paving in two lifts, and the second lifts will be <br />completed the next year in order to ensure that any settling after winter is <br />addressed prior to installing the last lift. The Engineer then reported that <br />there will be times that driveway access is restricted due to construction <br />activities. However, emergency vehicle access will be maintained at all <br />times. Mail and garbage service will be maintained. Mail service is <br />typically moved to a temporary box outside the project area if the Post <br />Master requests. The Engineer reported that property owners will be kept <br />informed of timing of construction activities that will restrict access. He <br />also noted that there will be an on-site inspector available to address <br />property owner concerns. He noted that the Code allows construction <br />work hours from 7 a.m. to 10 p.m. on weekdays and 9 a.m. to 9 p.m. on <br />Saturdays. The Engineer reviewed the anticipated project timeline. <br />The City Engineer reported on project funding, noting that sanitary sewer, <br />water main and storm sewer repair costs would not be assessed. 50% of <br />the street costs will be funded through special assessments to benefitting <br />property owners. The Engineer then explained the special assessment <br />process in detail which is based on the City's Assessment Policy that has <br />been in place since 1995. The Engineer noted that all of the properties in <br />the townhome association will be assessed $1,909.09 for one unit. This is <br />consistent with how the assessments for Jackson were divided. <br />Keis asked if anyone was not in support of proceeding with the <br />improvement project. No one in attendance commented. <br />►l <br />
The URL can be used to link to this page
Your browser does not support the video tag.