My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-2018 Council Packet
>
City Council Packets
>
2010-2019
>
2018
>
02-28-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:27:56 AM
Creation date
3/6/2018 12:55:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br /> <br />TO: Mayor Keis and Members of the City Council <br /> <br />FROM: Joel Hanson, City Administrator <br /> <br />DATE: February 22, 2018 <br /> <br />RE: Old Fire Hall Exterior Renovations <br /> <br /> <br />Dick Krumm, of RVK Architects, has submitted the attached bid packages and drawings for your <br />consideration related to the exterior renovations of the Old Fire Hall. Staff has asked the following <br />questions related to the documents provided: <br /> <br />• Should we include an alternate for metal cap versus terra cotta? <br />• Do we need to specify the brick to be used to ensure accurate pricing? <br />• Should the landscaping along LC Road be done as a rain water garden to lower on-going <br />maintenance (the City Engineer could comment as to whether this makes sense or not)? <br />• If we keep the landscaping beds as shown, what serves as the edging between the pavement <br />and the bed? Do we need landscape curbing? <br />• Should we be irrigating the landscaping beds if they are not done as rain water gardens? <br />• Should we provide some other options for exterior finishes on the other three sides? <br />• Based on the price of $1,200 per door, wrapping the doors seems reasonable. However, <br />should we bid replacement to see the cost/quality difference? <br />• Shouldn’t we specify R-Values, membrane, fastening, and warranty for the re-roof? <br />On the following page are the notes from the last Committee meeting to aid in your review of the <br />project. <br />Mr. Krumm should be present at Wednesday’s meeting to review this project with you. The Council <br />should comment on the proposed workscope so specifications can be finalized and we can get it <br />out to market ASAP. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.