My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-14-2018 Council Packet
>
City Council Packets
>
2010-2019
>
2018
>
03-14-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:27:56 AM
Creation date
4/5/2018 4:52:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 of 1 <br />10062 Flanders Court NE – Blaine, MN 55449 – Ph: (763) 780-0450 Fax (763) 780-0452 <br />Memo <br />TO: Honorable Mayor and City Council Members <br />FROM: Lee Elfering, City Engineer <br />DATE: March 13, 2018 <br />RE: Suite Living Memory Care <br />Plan and Drainage Calculation Submittal <br />This memo serves as an update to our March 9th memo to the City Council based on the <br />review of new information submitted. The plat, plans, and drainage calculations have <br />been reviewed and meet the City requirements. A draft of the Watershed maintenance <br />agreement for the site was reviewed and while it addresses the ongoing maintenance of <br />the basin for stormwater control and functionality we feel it lacks requirements for the <br />aesthetic maintenance of the basin vegetation. <br />At this time staff would recommend the City Council approve the development <br />contingent on the following item: <br />1.The Watershed maintenance agreement be revised to incorporate the <br />aesthetic maintenance of the basin vegetation or a separate agreement be <br />executed between the Developer and the City requiring the maintenance of <br />the vegetation for aesthetic purposes. <br />In addition the Developer must also complete the following prior to any construction <br />activities occurring on the site. <br />1.Hold a preconstruction conference with the City and Contractor(s) completing <br />the work. <br />2.Submit copies of the Ramsey Washington Metro Watershed District permit <br />and National Pollution Discharge Elimination System (NPDES) permit for the <br />project to the City. <br />3.Submit copies of the right-of-way, utility, and access permits from Ramsey <br />County to the City. <br />4.The south property line be staked in the field and a review of significant trees <br />be completed before any clearing is done. After determining if there are any <br />significant trees to save additional staking should be completed to determine <br />the cut/fill impacts near the significant trees and a determination made if <br />modification can or should be made to the grading to protect each tree. <br />Please contact me if you have any questions regarding the above information at (763) <br />780-0450 ext. 3. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.