My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-05-2018 Parks & Rec Packet
>
Agenda Packets
>
2010-2019
>
2018
>
04-05-2018 Parks & Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 9:21:04 AM
Creation date
5/15/2018 11:27:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br />TO: Parks & Recreation Commission <br /> <br />FROM: Bryce Shearen, Parks & Recreation/Community Services Manager <br /> <br />DATE: March 29, 2018 <br /> <br />RE: Pioneer Park Trail Improvements Update <br /> <br />Staff met with the City Engineer to discuss trail replacement work that was scheduled to be done this <br />summer in Pioneer Park. The attached document shows the sections of trail that were scheduled to be <br />repaired. <br /> <br />There are some challenges to complete the section of trail to the east of the pavilion. Large heavy <br />trucks and equipment are needed in order to do the work. Both the pedestrian bridge to the east and <br />paver stones that surround the pavilion to west does not allow a viable way to get to that section of <br />trail. An alternative route was discussed, driving along the edge (warning track) of one or two fields. <br />Damage to the turf, irrigation, fencing, and fields seemed very likely. This would affect the <br />programming that occurs at the park and possible put a couple fields out of service for the season. <br />There has also been some discussions on renovating, replacing, or keeping the pavilion as is, which <br />might play a part in acceptable route for construction equipment. <br /> <br />The section of trail abutting the playground was also scheduled to be repaired. It was discussed that <br />with the conversations the Commission has had and are currently having about Pioneer Park and the <br />playground, that footprint may change in the near future. It did not make sense to replace a section of <br />trail and then change it in the near future. <br /> <br />After closer review, it was determined that work should be delayed until a more comprehensive plan <br />has been made on the future of Pioneer Park. Public Works will make small scale repairs to get the <br />trails by for now. More information to come on this as the Parks Master Plan is completed and <br />forward progress can begin on the priorities outlined in the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.