My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-2018 Council Packet
>
City Council Packets
>
2010-2019
>
2018
>
06-06-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:27:56 AM
Creation date
6/19/2018 3:26:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 5 62 <br />ACTION DESCRIPTION RESPONSIBILITY PRIORITY <br />EFFORT/ <br />COST IMPACT TIMEFRAME <br />FACILITIES <br />Implement <br />improvements at <br />Spooner Park <br />Replace the current playground Parks & Recreation, <br />Engineering, Public <br />Works <br />High High Immediate <br />Create additional parking with new lot in <br />NE corner of park <br />Parks & Recreation, <br />Engineering, Public <br />Works <br />High Medium Short <br />Update the sand volleyball court Parks & Recreation Low Medium Immediate <br />Improve universal access throughout the <br />park <br />Parks & Recreation, <br />Engineering <br />High High Short <br />TRAILS <br />Initiate planning <br />on priority projects <br />to prepare for <br />collaboration with other <br />agencies and secure <br />funding <br />Determine infrastructure and right-of-way <br />needs; develop schematic designs and <br />cost estimates for pedestrian connections <br />over 694. <br />Parks & Recreation, <br />Engineering, Public <br />Works <br />Medium High Short <br />Determine infrastructure and right-of-way <br />needs; develop schematic designs and <br />cost estimates for pedestrian connections <br />over I35E. <br />Parks & Recreation, <br />Engineering, <br />Medium High Short <br />Determine infrastructure and right-of-way <br />needs for the Trout Brook Trail/connection <br />over Highway 36 <br />Parks & Recreation, <br />Engineering, <br />Medium High Short <br />Work to acquire the necessary land/ <br />easements West of Payne Avenue to <br />continue the Power Line Trail to Edgerton <br />Parks & Recreation, <br />Engineering, <br />High High Ongoing <br />Construct prioritized <br />projects to minimize <br />gaps in the system <br />Fill walkway gaps on Rice Street Parks & Recreation, <br />Engineering, Public <br />Works <br />Medium High Short <br />Pavement Management Continue to assess and maintain paved <br />trails, including park trails and off-street <br />trails <br />Parks & Recreation, <br />Engineering, Public <br />Works <br />Medium High Ongoing <br />PROGRAMMING <br />Monitor and match <br />interests and offerings <br />of programs <br />Develop and implement a statistically <br />valid community survey focusing on <br />programming needs <br />Parks & Recreation High High Short <br />FUNDING <br />Maintain/ <br />expand funding for <br />maintenance and <br />equipment replacement <br />Set the foundation for the pursuit of <br />additional funding, whether from state <br />bond funds, grants, donations, the general <br />funds, or a referendum if needed. <br />Parks & Recreation Medium High Ongoing <br />TABLE 5.1 PRIORITY ACTIONS CONTINUED
The URL can be used to link to this page
Your browser does not support the video tag.