Laserfiche WebLink
<br />public sidewalks. The ability to make a “V” with the plow will allow us to keep roads and <br />driveways between sidewalks cleaner rather than leaving windrows after the big plows have <br />already gone by. Both of these accessories are budgeted at $4000. <br /> <br />Ballfield Painter: The ballfield painter is scheduled to be replaced in 2019. The current painter <br />has been a workhorse but is approaching the end if it’s useful life. The painter is used to paint <br />ballfields, soccer fields, football fields, and volleyball courts for Canadian Days. <br /> <br />Water and Sewer Budget Highlights <br />GPS Device: As the City moves further in technology more tools are needed. Staff has budgeted <br />$9,000 for a GPS device and software to allow for getting accurate GPS coordinates of items like <br />curb stops and signs so they can be added to our GIS mapping. Eventually we will be able to <br />record all of our routine and emergency maintenance work on the GIS system so we can readily <br />reference it both at the PW shop and in the field remotely. <br /> <br />Gate Valve Operator: Staff exercises all of the gate valves on our water main system each year <br />in the spring. This involves dropping a wrench on the nut 6-18 feet deep and hand turning the <br />wrench between 20 and 48 turns depending on the size of the valve. There are over 600 valves <br />in the system and some are harder to turn than others. The repetitive nature of the work can lead <br />to back, shoulder, or elbow problems. A gate valve operator allows the operator to mechanically <br />turn the valve without having to turn the wrench. $7,000 has been budgeted for 2019 for a gate <br />valve operator. <br /> <br />Replacement of Sewer Truck: This is explained in detail as a separate item on the agenda. <br /> <br />Pumps: We have budgeted $18,000 to replace a pump at the Sunset Court lift station and <br />$18,000 to overhaul pump #2 at the Booster Station. The Sunset lift station is our dirtiest and <br />heaviest flowing lift station and the pumps take a beating. The other pump was replaced in 2018. <br />The Booster Station pumps need to be overhauled every five-to-six years. Pump #1 was <br />overhauled last year. <br /> <br />Rice Street Valves: $60,000 has been budgeted for the potential repair/replacement of the gate <br />valves located in the section of Rice Street scheduled for reconstruction in 2021. Staff may have <br />a contractor dig the valves up and either repair or replace them if necessary so that the work is <br />completed ahead of the project and doesn’t slow down the project once it begins. <br /> <br />Additional Considerations: <br />The budget is the primary guide for expenditures throughout the year; however changes may be <br />necessary due to unforeseen circumstances. Additional considerations for 2019 include: <br />• Potential changes to the Law Enforcement Contract related to body cameras <br />• Potential reduction in health insurance premiums if alternative plan is implemented