My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-19-2018 Council Packet
>
City Council Packets
>
2010-2019
>
2018
>
12-19-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:27:56 AM
Creation date
1/10/2019 10:26:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 1 <br /> <br />10062 Flanders Court NE – Blaine, MN 55449 – Ph: (763) 780-0450 Fax (763) 780-0452 <br /> <br />Z:\PROJ\120215E - 2019 Street Improvements\0030\Feasibility\Memo-121418-CC (2019 Feasibility).doc <br /> <br /> <br /> <br />Memo <br /> <br />TO: Honorable Mayor and City Council Members <br /> <br />FROM: Lee Elfering, City Engineer <br /> <br />DATE: December 14, 2018 <br /> <br />RE: 2019 Street & Utility Project Feasibility Report <br /> Call for Public Hearings <br /> <br /> <br /> <br />As required as part of the chapter 429 process a feasibility report is being completed for <br />the proposed 2019 Street and Utility Improvements project. The streets being reviewed <br />for improvement are as follows: <br /> <br /> County Road D – Payne Avenue to Greenbrier <br /> Greenbrier Street – County Road D to Labore Road <br /> <br />Informational meetings were held with each neighborhood to obtain resident input and <br />gauge project acceptance. The County Road D meeting was held as a joint meeting <br />with Vadnais Heights and the County and there was little input received. The Greenbrier <br />Street meeting was held last week. Minutes from those meetings are included in the <br />report. <br /> <br />A survey has also been sent out to the residents along Greenbrier Street to give each <br />resident a chance to provide individual input for or against the project. The results of the <br />survey are being compiled and will be added to the feasibility report which will be <br />provided as an addition to the agenda packet before the meeting. <br /> <br />Please contact me at 763-780-0450 ext. 3 with any questions or concerns regarding the <br />report.
The URL can be used to link to this page
Your browser does not support the video tag.