My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2019 Planning Commission Packet
>
Agenda Packets
>
2010-2019
>
2019
>
05-09-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 12:49:19 PM
Creation date
5/9/2019 12:04:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discussion should not result in suggestions for revised lot layout via Keller Parkway. That is the <br />responsibility of the applicant to prepare a new design and supporting evidence that the Planning <br />Commission can react too. <br />Vacation of Easement <br />There are two existing drainage and utility easements that run north to south in the center of 675 <br />Keller Parkway that were not vacated with the approved lot combination in 2006. There is a five foot <br />easement from the former 640 Labore Road that would have been the eastern side yard property line <br />and a six foot easement that would have been the western side yard property line for 675 Keller <br />Parkway. Regardless of the above actions, these old lot line easements are no longer necessary for 675 <br />Keller Parkway as one parcel. If approvals are granted for a lot split, any future subdivision would <br />require dedication of perimeter drainage and utility easements for the newly created lots. <br />Therefore, city staff is recommending approval of the vacation of drainage and utility easements as <br />proposed by Mr. Yargici.
The URL can be used to link to this page
Your browser does not support the video tag.