|
BID TABULATIONPROJECT: SPOONER PARK IMPROVEMENTSOWNER: CITY OF LITTLE CANADAENGINEER: ELFERING & ASSOCIATESITEM SPEC ITEM DESCRIPTIONNO. NO,UNIT TOTAL UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICEQTY ($) ($) ($) ($) ($) ($) ($) ($)SCHEDULE 1.0 - SPOONER PARK IMPROVEMENTS1 2021.501 MOBILIZATIONLS 1.00 $11,750.00 $11,750.00 $16,600.00 $16,600.00 $15,000.00 $15,000.00 $28,690.00 $28,690.002 2101.502 CLEARINGTREE 11.00 $368.00 $4,048.00 $640.00 $7,040.00 $650.00 $7,150.00 $771.00 $8,481.003 2101.507 GRUBBINGTREE 11.00 $240.00 $2,640.00 $275.00 $3,025.00 $300.00 $3,300.00 $330.50 $3,635.504 2104.501 REMOVE PLAY AREA PERIMETER CURBLF 460.00 $8.95 $4,117.00 $10.00 $4,600.00 $3.50 $1,610.00 $2.60 $1,196.005 2104.503 REMOVE BITUMINOUS PAVEMENTSF 4,820.00 $1.00 $4,820.00 $0.40 $1,928.00 $1.00 $4,820.00 $0.40 $1,928.006 2104.503 REMOVE CONCRETESF 35.00 $12.40 $434.00 $7.00 $245.00 $1.00 $35.00 $15.60 $546.007 2104.513 SAW CUT BITUMINOUS (FULL DEPTH)LF 35.00 $10.00 $350.00 $5.00 $175.00 $4.00 $140.00 $6.30 $220.508 2105.501 COMMON EXCAVATION (P)CY 195.00 $24.85 $4,845.75 $47.00 $9,165.00 $20.00 $3,900.00 $96.00 $18,720.009 2105.507 GRANULAR BORROW (CV) (P)CY 1,460.00 $23.60 $34,456.00 $38.25 $55,845.00 $50.00 $73,000.00 $19.60 $28,616.0010 2105.525 SAND MEDIACY 85.00 $37.75 $3,208.75 $62.00 $5,270.00 $85.00 $7,225.00 $77.75 $6,608.7511 2211.501 AGGREGATE BASE CLASS 5 TON 740.00 $27.75 $20,535.00 $25.00 $18,500.00 $30.00 $22,200.00 $30.00 $22,200.0012 2350.501 TYPE WEAR COURSE MIXTURE (TRAIL)TON 65.00 $137.00 $8,905.00 $125.00 $8,125.00 $130.00 $8,450.00 $200.50 $13,032.5013 2350.501 TYPE NONWEAR COURSE MIXTURE (TRAIL)TON 65.00 $137.00 $8,905.00 $125.00 $8,125.00 $130.00 $8,450.00 $195.50 $12,707.5014 2502.541 4" PERF TP DRAIN AND ROCK TRENCHLF 125.00 $26.80 $3,350.00 $23.00 $2,875.00 $25.00 $3,125.00 $41.50 $5,187.5015 2502.541 4" PERF TP DRAIN W/SOCK LF 200.00 $16.65 $3,330.00 $15.75 $3,150.00 $15.00 $3,000.00 $41.25 $8,250.0016 2503.503 4" SCHEDULE 40 PVC PIPE SEWERLF 40.00 $23.75 $950.00 $23.00 $920.00 $15.00 $600.00 $273.50 $10,940.0017 2506.502 27" DIA. STORM STRUCTUREEACH 1.00 $4,800.00 $4,800.00 $2,900.00 $2,900.00 $2,500.00 $2,500.00 $4,430.00 $4,430.0018 2531.507 CONCRETE SIDEWALK (4" THICK)SF 2,015.00 $6.75 $13,601.25 $6.00 $12,090.00 $10.00 $20,150.00 $9.80 $19,747.0019 2545.503 4" NON-METALLIC CONDUIT (INCLUDES FITTINGS) LF 25.00 $47.20 $1,180.00 $40.00 $1,000.00 $35.00 $875.00 $103.50 $2,587.5020 2563.601 TRAFFIC CONTROLLS 1.00 $590.00 $590.00 $1,200.00 $1,200.00 $750.00 $750.00 $1,890.00 $1,890.0021 2571.524 TRANSPLANT TREETREE 6.00 $240.00 $1,440.00 $225.00 $1,350.00 $300.00 $1,800.00 $631.00 $3,786.0022 2573.502 SILT FENCE, TYPE MACHINE SLICEDLF 1,550.00 $3.25 $5,037.50 $2.50 $3,875.00 $2.50 $3,875.00 $4.40 $6,820.0023 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1.00 $1,750.00 $1,750.00 $850.00 $850.00 $2,500.00 $2,500.00 $2,750.00 $2,750.0024 2573.607 ROADWAY ROCK CHECK DAMCY 20.00 $102.00 $2,040.00 $89.00 $1,780.00 $150.00 $3,000.00 $47.25 $945.0025 2574.525 TOPSOIL BORROWCY 50.00 $59.00 $2,950.00 $36.00 $1,800.00 $75.00 $3,750.00 $51.25 $2,562.5026 2574.550 PLANTING SOILCY 25.00 $75.00 $1,875.00 $59.00 $1,475.00 $85.00 $2,125.00 $94.00 $2,350.0027 2575.505 SEEDINGACRE 1.05 $10,300.00 $10,815.00 $4,500.00 $4,725.00 $5,000.00 $5,250.00 $7,050.00 $7,402.5028 SPEC TRACER WIRE (DRAIN TILE)LF 325.00 $1.20 $390.00 $2.00 $650.00 $2.50 $812.50 $2.75 $893.7529 SPEC DENSITY TESTEACH 5.00 $110.00 $550.00 $250.00 $1,250.00 $80.00 $400.00 $631.00 $3,155.0030 SPEC PROCTOR TESTEACH 1.00 $290.00 $290.00 $250.00 $250.00 $250.00 $250.00 $202.00 $202.0031 SPEC GRADATION TESTEACH 1.00 $290.00 $290.00 $250.00 $250.00 $230.00 $230.00 $151.50 $151.5032 SPEC AIR VOIDSEACH 1.00 $460.00 $460.00 $250.00 $250.00 $375.00 $375.00 $328.00 $328.0033 SPEC CONCRETE TESTING, CYLINDERS (SET OF 3) EACH 1.00 $460.00 $460.00 $250.00 $250.00 $435.00 $435.00 $631.00 $631.0034 SPEC EXTRACTION/GRADATIONEACH 1.00 $450.00 $450.00 $250.00 $250.00 $190.00 $190.00 $378.50 $378.5035 SPEC NUCLEAR BITUMINOUS DENSITYEACH 3.00 $300.00 $900.00 $315.00 $945.00 $110.00 $330.00 $347.00 $1,041.00SCHEDULE 1.0 - SPOONER PARK - TOTAL$166,513.25 $182,728.00 $211,602.50 $233,010.50FRATTALONE COMPANIES, INCSTANDARD CONTRACTING, INC. SUNRAM CONSTRUCTION, INC. BLACKSTONE CONTRACTORS, INC1
|