Laserfiche WebLink
expansion of use(s). The parameters of the grandfathering rights were agreed upon in November 2016 <br />during an appeal of zoning code from Mr. Erdmanis. The purchase of the property by Mr. Holm with <br />the proposed use(s) would be considered a change in use. <br />In 1988 when the rezoning of this area occurred, the I-1 and I-P Industrial Districts were essentially the <br />same for the type of uses allowed (with the exception that the I-P would not allow auto repair). The <br />City rezoned those parcels having direct frontage along South Owasso Boulevard between Country <br />Drive and Rice Street. The intention was to create a corridor along South Owasso where industrial <br />uses were still deemed reasonable. However, the distinctions between the two were that the I-P <br />District would require higher quality site improvements and building materials (i.e. metal buildings <br />would be precluded) and a smaller of ratio for outdoor storage was allowed (1988 code allowed 75% <br />of principal structure or 25% of lot area, whichever is less). In 2005, the I-P District was amended to <br />reduce the square footage of outdoor storage area allowed (25% of principal structure or 10% of lot <br />area, whichever is less) and limiting the location to rear yard only. Those are the current standards still <br />in effect today. Mr. Holm is seeking a variance to allow the outdoor storage as allowed in the I-1 <br />District for two requirements: 1) outdoor storage up to 60% of the lot area, and 2) to be located in the <br />side yard. <br />The text amendment portion of the request would be to create an Interim Use Permit in the I-P District <br />that allows for accessory use of the property (i.e. outdoor storage) without occupying the property. <br />The applicant has indicated that construction would begin within 36 months, but in the interim they <br />would like to utilize the site for outdoor storage. Future plans include construction of a new 15,000 to <br />35,000 (site plan shows 25,000) square foot office/warehouse building, plus an onsite waste water <br />disposal detached accessory building. There were two site plan options submitted. In option one, all <br />existing buildings are removed and new structures are proposed. In option two, the onsite waste water <br />disposal component would be constructed within the existing accessory building. The applicant does <br />indicate in the narrative that the building materials would comply with the I-P building standards, but <br />no building elevations were submitted for review. It is worth mentioning that this property does not <br />fall within the commercial areas requiring Architectural Review so future building plans will not <br />require Planning Commission or City Council review prior to permit process. <br />Site Plan Review <br />Both site plans show similar building size, but vary in layout (option two also provides an option for <br />“future expansion”). The proposed office and warehouse uses comply with allowed uses in the I-P <br />District. Additionally, accessory buildings such as the proposed detached waste water disposal facility <br />are also permitted. In section 918.030.A for Permitted Accessory Uses it allows “commercial or <br />business buildings and structures for a use accessory to the principal use, but such use shall not exceed <br />thirty (30) percent of the gross floor space of the principal use”. The applicant indicates constructing a <br />building between 15,000 – 35,000 square feet depending on feasibility. Based on those dimensions, <br />the following would be the 30% maximum accessory building size allowed: <br />15,000 square foot building = 4,500 square feet <br />25,000 square foot building = 7,500 square feet <br />35,000 square foot building = 10,500 square feet <br />The site plans submitted illustrate a waste water disposal accessory building ranging from 5,300 to <br />6,000 square feet. Depending on principal building size constructed, the waste water disposal building