Laserfiche WebLink
Pioneer Park Irrigation Expansion -For improved infield maintenance and dust control, <br />we are proposing to add one quick coupler valve to each infield. These valves are <br />like having a hose spigot at each infield. Estimated cost is $2,000 <br />Replace "Clatter-Bridge" -The "Clatter Bridge" at Spooner Pazk has worn to the point <br />where for safety reasons it needs to be replaced in 2001 for an estimated cost of <br />$2,500. <br />It should be noted that our play ground equipment is aging and wearing out. Even <br />with constant maintenance, equipment eventually needs to be replaced. A lot of <br />our playground equipment is about 9 years old. A program needs to be created in <br />the near future where we can replace worn out equipment and spread needed <br />replacement costs out over many years. <br />Page 8 <br />