Laserfiche WebLink
MAR-03-2000 1447 HR GREEN CO. 651 644 2349 P.03i03 <br />Mr. Anthony J, Pini, P.E_ <br />March 3, 2000 <br />Page Two <br /> <br />5. We have discussed further the issue of the drainage which flows around the building and <br />ultimately crosses the sidewalk between the parking lot and your proposed building. We <br />believe that the drainage should be swated and dropped into a structure and piped under <br />the sidewalk, the outlet through the proposed retaining wall, onto the St. Pau! Water Works <br />property. This wilt avoid sheet flow over the sidewalk and @liminate any potential hazard <br />created by water flowing over the sidewalk, <br />tf you have any questions regarding any of these issues, please call. <br />Sincerely, ~ ` <br />Howard R. Green Company <br />/~_`- <br />Terry/~ J. NYaurer, PEE <br />TJM:mw <br />Cc: Greg Schroeder, City of Little. Canada <br />Steve Griflman, Northwest Associated Consultants, 5775 Wayzata Btvd, Suite 555, <br />St. Louts Park, MN 55416 <br />o:wROa~oosaro.nozaov.rr 3.3-0o nP~N.doc <br />Howard R. Green Company <br />CCNSULTING-ENGINEERS <br />TOTAL P.03 <br />Page 22 <br />