Laserfiche WebLink
ITEIA ORIGINAL CONTRACT THIS PERIOD ioTAL TO DATE <br />N0. ITEM DESCRIPTION UNIT ON. UNIT PRICE Ott. TOTAL PRICE DTY. TOTAL PRICE <br />15 TYPE MV4 WEPft COURSE MIXTURE YON 250 SG925 000 0000! 000 5000 <br />14 TYPE LV3 NON WEARING COURSE MIXTURE 6hSE TON 20000 565.25 0.00 50.00 000 SO.OD <br />15 CONCRETE SIDEWALK d"THICK SF SO Sd 00 0.00 _5900 0.00 50.00 <br />_1fi_. <br />4 ,,,,_„ CONCRETE DRIVEWAY PAVEMENT(0`THICK) ,,._,,,_,,,_ <br />ADJUST VAIVE $f <br />EACH 1450„ <br />t _,.-_56 C0 <br />SN600 000 <br />000 50.00 0.00 <br />5000 000 5000 <br />50.00 <br />10 _ <br />INSTPLI SPWPGED SIGN EACH 3 5100.00 000 5000 0.00 50.00 <br />t9 INSTALL SAVAGED LIGHT POLE EACH 1 5)5000 000 50001 0.00 50.00 <br />20 INSTALL GAWAGED METAL GATE EACH 2 6500.00 0.00 50.00 0.00 50.00 <br />21 iRAFfIC CONTROL __ , LS f _ _._§dS000 O.OC __ ___ 5000 O.OD ___, ,,,,,,,_--,._,_ 00 <br />SCHEDULE d.O-TOTAL Bi000].06 41008]06'' <br /> S H DUL.5.0-2 0.T T ANITARY REP ACEM E T <br />i MOBILIZATION LS i St 55000 100 5155000 1.00 SI 550.00 <br />2 REMOVE SANITARY SERVICE PIPE LF 30 5800 IS.OD 5120.00 I60D 120.00 <br />3 __ <br />REMOVE BITUMINOUS PAVEMENT SY AO 514.00 45.00 55]200 4000 56)2.00 <br />4 SAW CUT BITUMINOUS FULL DEPTH if 55 5400 5900 5236.00 590'J 5236.00 <br />S MILL BITUMINOUS PAVEMENT SY 25 5900 0.00 5000 0.00 5000 <br />6 9RUMWOU65YREEY PATCH 9Y 40 515 G0 9800 SidS80 40.00 5]40.00 <br />> CONNECT TO EXISTING SANITARY SEWER EACH 2 51'v000 2.00 5300.00 200 5300.00 <br />0 4"PVC SERVICE PIPE SCH 40 LF 30 56000 15.00 5900.00 : 15.00 58W.00 <br />9 TRAFFIC CONTROL <br />,. <br />_ l5 1 5]50.00 .__,.___00 9)50.00 1 100 5]50.00 <br />10 __,__„_,- <br />, _ <br />,_ <br />4SOLIDLINE WHITE •EPO%T Lf 40 534 50 000 50.00 0.00 5000 <br /> SCHEDULE 5.0-TOTAL 552]6.00 952]6.00 <br /> <br /> S EDUCE 60• NA GE RDER9 <br /> C E ER lS 1 511992 d2 100 51199242 t00 51199242 <br /> SCHEDULE 6.0-TOTAL 911,992.42 511992.42 <br />RID SUMMARY <br />SCHEDULE 1.0 - TIF BOUNDARY PREP <br />SCHEDULE 2.0.OUTSIDE TIF BOUNDARY AREA <br />SGMEOULE 3.0 - ST JUOE FUNDED WATERMAIN <br />SCHEDULE 0.0-GT DUDE FUNDED DRIVEWAY <br />GLNEOULE 6.0 - 2930 EDGERTON bT SANITARY REPLACEMENT <br />SCHEDULE 6.0-CHANGE ORDERS <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br /> TOTAL THIS PERIOD TOTAL TO DATE <br />AMOUNT EARNED 616C,600.GJ 5304.562.23 <br />AMOUNT RETAINED SBR34A3 519,228.H <br />MATERIAL ON SITE 50.00 5000 <br />MATERIAL DEDUCT. 60.00 5000 <br />PREVIOVS PAYMENTS ""•""•"""""""""""" $205.0]9.92 <br />AMOUNT DUE 6156.454.20 5156,450.20 <br /> <br />THIS PERIOD <br />923.4]5.54 <br />6104,000.01 <br />59.]]6.00 <br />510,00]. W <br />$5,2]680 <br />511,892.42 <br />5164,600.63 <br />TOTFI TO DATE <br />$164,965.94 <br />5168,626.01 <br />623,%52.00 <br />610,08] O6 <br />65,2%6.00 <br />511,992.42 <br />5504,66225 <br />4 <br />