Laserfiche WebLink
CHANGE ORDER #1 <br />(Attachment) <br />This contract is amended as follows: <br />WHEREAS: It was determined by the Engineer that an existing hydrant lead and hydrant <br />should be removed due to conflicts with the new watermain alignment and <br />excessive depth of the hydrant; and <br />WHEREAS: It was determined by the Engineer that a wet tap of the watermain should be <br />completed instead of the anticipated iee connection to eliminate water shut off for <br />all properties south of TH 36; and <br />WHEREAS: It was determined by the Engineer that an additional 12" watermain valve should <br />be added for greater ability to isolate sections of the watermain system; and <br />WHEREAS: The watermain at Stephanie Court was located approximately 30 feet from the <br />as-built location and extra crew time was spent locating and connecting to the <br />existing watermain. <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br />1. The Contractor shall complete the above described changes and additions to the project. <br />2. Payment for the work was reviewed and approved by the Engineer. <br />3. The Contractor will not make claim of any kind or character for any other costs or <br />expenses that he may have incurred or that he may hereafter incur in performing the <br />work or furnishing the materials of this agreement. <br />3 <br />