Laserfiche WebLink
D. Definitions: Unless specifically defined below, words or phrases used in this <br />Chapter shall be interpreted so as to give them the same meaning as they have in <br />common usage and to give this Chapter its most reasonable application. For the <br />purpose of this Chapter, the words "must" and "shall" are mandatory and not <br />permissive. All distances, unless otherwise specified, shall be measured <br />horizontally. As used in this Chapter, words and terms shall have the meanings <br />ascribed to them in Appendix B. <br />928.020. STORMWATER MANAGEMENT <br />The following standards shall apply to all developments and redevelopments within the <br />City: <br />A. Stormwater Management Plan. Every applicant for a building permit that involves <br />disturbing 20,000 sq. ft. of land, subdivision approval, or a permit to allow land <br />disturbing activities must submit a Stormwater management plan to the City. No <br />building permit, subdivision approval, or permit to allow land disturbing activities <br />shall be issued until approval of this plan. All plans shall be consistent with <br />National Pollution Discharge Elimination Permit (NPDES) requirements, and the <br />filing or approval requirements of relevant Watershed Districts, Watershed <br />Management Organizations, Soil and Water Conservation Districts, or other <br />regulatory bodies. <br />General Policy on Stormwater Runoff Rates -Site plans for new <br />development and redevelopment involving 20,000 sf or more of <br />disturbance of any kind will be assessed for Stormwater quantity control <br />and Stormwater quality management. The general policy on Stormwater <br />runoff rates is to reduce the impacts of development by maintaining pre- <br />development hydrological conditions or improving conditions to <br />positively affect the downstream watershed. <br />2. Stormwater Management Plan Requirements -The minimum requirements <br />of the Stormwater Plan shall be consistent with the most recent version of <br />the Minnesota Pollution Control Agency's NPDES Consriuction Permit <br />Requirements <br />a. Identification and description <br />(1) Project name; <br />(2) Project type (residential, commercial, industrial, road <br />construction, or other); <br />(3) Project location; <br />(4) County parcel identification number (legal description); <br />Sta•mwater Ordinance 928- 2 <br />