My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-08 Planning Comm. Agenda
>
Agenda Packets
>
2000-2009
>
2008
>
09-11-08 Planning Comm. Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2008 2:03:15 PM
Creation date
9/5/2008 2:01:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Development <br />Required Volume (ft') =Impervious surfaces (ftZ) x 1.0 (in) x 0.9 coefficient x 1/12 (ft/in) <br />Redevelopment <br />Required Volume (ft3) =Impervious surfaces (ftZ) x 1.0 (in) x 0.45 coefficient x 1/12 (ft/in) <br />a. When using infiltration for volume reduction, the following <br />requirements must be met: <br />(I) Infiltration volumes and facility sizes shall be calculated <br />using the appropriate hydrological soil group classification <br />and design infiltration rate from Table 1. Select the design <br />infiltration rate from Table 1 based on the least permeable <br />soil horizon within the first five feet below the bottom <br />elevation of the proposed infiltration BMP. <br />(2) The applicant may complete double-ring infiltrometer test <br />measurements at the proposed bottom elevation of the <br />infiltration BMP to the requirements of ASTM D3385. The <br />measured infiltration rate shall be divided by the <br />appropriate correction factor selected fiom the Minnesota <br />Stormwater Manual. This test must be completed by a <br />licensed soil scientist or engineer. <br />Table 1. Design Infiltration Rates <br />Soil Group Soil Textures ASTM Unified Soil Rate <br /> Class S mbols <br /> Gravel, sand, sandy gravel, or silty GW, GP 1.63 in/hr <br />A gravel, loamy sand, sandy loam GM, SW, SP 0.80 in/hr <br /> SM 0.60 in/hr <br />B Loam, Silt loam <br /> ML, OL 0.30 in/hr <br />C Sandy clay loam GC, SC 0.20 in/hr <br />D Clay loam, silty clay loam, sandy CL, CH, OH, MH 0.00 in/hr <br /> cla ,silt cla , or clay <br />Source: Minnesota Stormwater Manual, November 2005. <br />(3) The infilhâ˘ation area shall be capable of infiltrating the <br />required volume within 48 hours for surface and subsurface <br />BMPs. <br />(4) Infiltration areas shall be limited to the horizontal areas <br />subject to prolonged wetting. <br />(5) Areas of permanent pools tend to lose infiltration capacity <br />over time and shall not be accepted as an infiltration <br />practice. <br />Stormwater Ordinance 928- 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.