My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-08 Planning Comm. Agenda
>
Agenda Packets
>
2000-2009
>
2008
>
09-11-08 Planning Comm. Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2008 2:03:15 PM
Creation date
9/5/2008 2:01:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. For all land disturbing activities covering one (1) acre or more, the <br />applicant shall comply with all requirements of the NPDES Phase <br />II regulations. <br />b. Identification of the nature of the construction activity and the <br />potential for sediment and other pollutant discharges from the site. <br />c. Designation of an individual to oversee implementation of the <br />SWPPP and provide a chain of responsibility. <br />d. Stockpiles of soil or other materials subject to erosion by wind or <br />water shall be covered, vegetated, enclosed, fenced on the down <br />gradient side or otherwise effectively protected from erosion in <br />accordance with the amount of time the material will be on site and <br />the manner of its proposed use. No stockpiling is allowed in the <br />street. <br />e. Measures and procedures to reasonably minimize site soil <br />compaction. <br />Provide that all silt fences used for erosion and sedimentation <br />control and all other temporary controls shall not be removed until <br />the City has determined that the site has been permanently <br />stabilized and shall be removed within 30 days thereafter. <br />g. Methods to prevent sediment damage to adjacent properties and <br />sensitive environmental areas such as water bodies, plant <br />communities, rare, threatened and/or endangered species habitat, <br />wildlife corridors, greenways, etc. <br />h. Design and construction methods to stabilize steep slopes. <br />i. Measures to control the quality and quantity of stormwater leaving <br />a site before, during, and after construction. <br />j. Stabilization of all waterways and outlets. <br />k. Protection of storm sewer infrastructure from sediment <br />loading/plugging. <br />Precautions taken to contain sediment when working in or crossing <br />water bodies. <br />m. Stabilization of disturbed areas, including utility consh•uetion <br />areas, as soon as possible. <br />n. Protection of outlying roads from sediment and mud from <br />consh•uction site activities. <br />Erosion Control Ordinance 927- 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.