My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-24-08 Council Agenda
>
City Council Packets
>
2000-2009
>
2008
>
09-24-08 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 3:26:13 PM
Creation date
9/22/2008 10:29:22 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 City shall respond to the variance request in writing and include the ~-- i Formattetl: Bullets and Numbering <br />justification for granting or denying the reauest <br />G Financial Securities The applicant Shall install or construct or 1??Y City fees for •- Formatted: Bullets and Numbering I <br />all stormwater mana¢ement performance standards necessary to maintain design <br />criteria as outlined in this section The Cit~}~require the applicant to provide <br />an in-kind or monetary contribution to the development and maintenance of City <br />stormwater management facilities desi¢ned to serve multiple land disturbing and <br />development activities undertaken by one or more persons <br />H Inspections and Enforcement Inspections will be performed by the Ci during ~- Formatted: Bullets and Numbering I <br />construction to ensure that stormwater management plan measures are properly <br />installed and maintained In all cases the inspectors will attempt to work with the <br />applicant or developer to maintain proper stormwater mono ement <br />1 Construction stop order -The City may issue construction stop orders until ' Formatted: Bullets and Numbering I <br />stormwater manaeement measures meet specifications A second <br />stormwater management inspection must then be scheduled and passed <br />before the final inspection will be done <br />2. Perimeter breach - If stormwater management measures malfunction and ~- Formatted: Bullets and Numbering <br />breach the perimeter of the site enter streets other public areas or <br />waterbodies the applicant shalt immediately develop a cleanup and <br />restoration plan obtain the right-of--way from the adjoiningpropertv <br />owner and implement the cleanup and restoration plan within 48 hours of <br />obtaining permission [fin the discretion of the Citv the applicant does <br />not repair the damage caused by the stormwater runoff the City can do the <br />remedial work required and charge the cost to the applicant <br />3 Actions to ensure compliance -The City can take the following action in ~ - Formatted: Bullets and Number <br />the event of a failure by applicant to meet the terms of this ordinance' l <br />a Withhold inspections or issuance of certificates or ap rp ovals f - Formatted: Bulletr and Numbering <br />b ReVOICe andpermit Issued by Cho ~)ity t0 fhe applicant ~ "' Formattetl: Bullets and Numbering <br />c Conduct remedial or corrective action on the development site or ~ "' ' Formatted: Bulletr and Numbering <br />adjacent site affected by the failure <br />d. Charge applicant for all costs associated with con•ecting the failure -' ' -~ Formatted; Bullets and Numbering <br />or remediatin damage from the failure [f payment is not made <br />within thirty days payment will be made from the applicant's <br />financial secm'ities. <br />e. Bring other actions against the applicant to recover costs of ~-- Formatted: Bullets and Numberinq <br />remediation or meeting the terms of this ordinance <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.