My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-24-08 Council Agenda
>
City Council Packets
>
2000-2009
>
2008
>
09-24-08 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 3:26:13 PM
Creation date
9/22/2008 10:29:22 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sir-~ihc ~..assoa~T~s <br />fuu>: nuufu <br />Memorandum <br />TO: Little Canada Mayor and City Council Members <br />FROM: Lee Elfering, City Engineer <br />DATE: September 19, 2008 <br />RE: 2007 Street & Utility Reconstruction <br />Change Order#4 <br />Background <br />During construction, field conditions and unforeseen items required staff to direct the <br />Contractor to complete extra work outside the scope of the original contract. The <br />additional work required included additional signage to ensure clearly marked routes to <br />the businesses on Viking Drive, the installation of a bollard at the Old Fire Hall parking <br />lot to protect the new improvements, repair of washout areas and construction of a flume <br />for future erosion protection, and removal of recycled class 5 from the Viking Drive <br />shoulder area. <br />The recycled class 5 from the Viking Drive shoulder area came from the cold in-place <br />recycled section which the County completed for the City. The road was narrowed in <br />this area and the recycled material was left in place to protect the shoulders from erosion <br />until the final wear was placed in 2008 and the boulevards were graded to match the <br />final bituminous mat elevation, <br />Summary and Recommendations <br />The Contractor completed the work outlined above as directed by the Engineer in <br />completion of the project. There was no means for compensation of this work provided <br />in the original contract and all cost for this work is outlined in Change Order #4. These <br />costs have been reviewed by our Inspectors and represent the actual time and cost of <br />the work based on our records and totals $8,765.65. <br />Based on the information above, we would recommend that the City Council approve <br />payment of Change Order 1i4. If you have any questions or would like to discuss this <br />issue please feel free to call me at (763) 780-0450 ext. 13. <br />Z:\PROJ\t20083E • 2007 Streel Reconstruction\0071\Change Orders\Memo-091908-CC (C04).doc <br />10062 Flanders Court NE -Blaine, MN 55449 - (763) 780.0450 fax (763) 780-0452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.