My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-24-08 Council Agenda
>
City Council Packets
>
2000-2009
>
2008
>
09-24-08 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 3:26:13 PM
Creation date
9/22/2008 10:29:22 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[f not available, appropriate flood zone determination or <br />wetland delineation, or both, may be required at the <br />applicant's expense. <br />(7) Map of watershed drainage areas, soil types, infiltration <br />rates, depth to bedrock, and depth to seasonal high water <br />table. <br />(8) Steep slopes where areas of 12% or more existing over a <br />distance for 50 feet or more. <br />(9) Bluff areas where the slope rises at least 25 feet above the <br />toe of the bluff and the grade of the slope from the toe of <br />the bluff to a point 25 feet or more above the toe of the <br />bluff averages 30% or greater. <br />l0 Wooded area and tree surve __as defined by the zonin_g_____._-.:_._ Deleted: <sr> <br />l ) ---..... - - ---- ......... y -------- <br />authority. ~ formatted: Bullets and Numbering <br />(l l) Agricultural Land preservation area(s), County Biological <br />Survey sites, or other officially designated natural resource. <br />(l2) Hydrologic calculations for volume runoff, velocities, and <br />peak flow rates by watershed, for the 2.0-yr, 10-yr, and <br />100-yr 24-hour storm events. These shall include: <br />(a) Pre-existing peak flow rates. <br />(b) Assumed runoff curve numbers. <br />(c) Time of concentration used in calculations. <br />(d) If a flood insurance study has been done by the <br />National Flood Insurance Program, the 100-year <br />flood elevation with and without the floodway. <br />(13) Bankfull discharge rate (1.5 year recurrence interval) of <br />creek or stream if there is a waterway on the site or if the <br />site discharges directly to the waterway. <br />c. Proposed Conditions - A complete site plan and specifications, <br />signed by the person who designed the plan shall be drawn to an <br />easily legible scale, shall be clearly labeled with a north arrow and <br />a date of preparation, and shall include, at a minimum, the <br />following information: <br />(1) Project map - An 8.5 by 11 inch United States Geological <br />Survey (USGS) 7.5 minute quad or equivalent map <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.