Laserfiche WebLink
Public Works Equipment 2019 Est.2020 2021 2022 2023 2024 Future Project Description <br />Trucks <br />PW Truck 51,542$ -$ -$ -$ -$ -$ -$ Replaced 2008 Ford F350 w/'19 F350 <br />PW Truck with plow 50,000 Replace 2011 Ford F250 (unit 111) <br />PW Truck 50,000 Replace 2011 Ford F250 (unit 211) <br />PW Truck 45,000 Replace 2011 GMC 2500 (unit 311) <br />PW Truck 48,000 Replace 2013 Ford F350 (unit 113) <br />PW Truck 40,000 Replace 2014 Ford F150 (unit 114) <br />Total Trucks 51,542 - 95,000 50,000 48,000 40,000 - <br />Large Trucks <br />Small dump truck 62,728 Replace 2003 Ford F550 (unit 203) <br />Dump Truck 190,000 Replace 2006 Single Axle (unit 105) <br />Total Large Trucks 62,728 190,000 - - - - - <br />Large Equipment <br />Toolcat 43,420 Replace 2006 Toolcat (unit 106) <br />Toolcat w/lift attachment 68,000 Replace 2013 Toolcat (unit 112) <br />Toolcat 56,000 Replace 2013 Toolcat (unit 112) <br />Skid loader 42,000 Replace 2012 Skid Loader (unit 212) <br />Portable air compressor 18,000 Replace 2003 (unit 303) <br />Wood chipper 35,000 Replace 2008 (unit 208) <br />Loader/Backhoe 100,000 Replace 1990 Case (unit 190) <br />Total Large Equipment 43,420 - 68,000 42,000 109,000 100,000 - <br />Other Equipment <br />Ball field painter 4,995 <br />Generator rehab.10,000 Rehab. '00 200 kW Generator(unit 600) <br />Plate packer 2,500 <br />LELY spreader 5,000 <br />Scissor lift 6,000 This will be a used piece of equipment <br />Snowblower 2,750 Replace 2001 Snowblower <br />Field Drags 5,000 <br />Jumping jack compactor 2,000 <br />Cut-off Saw 14""1,200 <br />Pickup broom 3,500 <br />Generator - 3000 watt 2,500 <br />Slit seeder 5,500 <br />Water Tank 4,000 <br />Bobcat Snowblower 6,500 <br />Speed board 3,500 <br />Total Other Equipment 4,995 23,500 9,750 7,200 5,500 14,000 - <br />Total Public Works Equipment 162,685$ 213,500$ 172,750$ 99,200$ 162,500$ 154,000$ -$ <br />Funding <br />Sales of existing equipment 14,500$ 30,000$ 40,000$ -$ -$ -$ -$ <br />Gen. Cap. Improve. Fund(400)148,185 183,500 132,750 99,200 162,500 154,000 - <br />Total Funding 162,685$ 213,500$ 172,750$ 99,200$ 162,500$ 154,000$ -$ <br />CITY OF LITTLE CANADA <br />CAPITAL PROJECTS 2020-2024 <br />PROJECTS BY DEPARTMENT PUBLIC WORKS <br />8