My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2019 Workshop & Council Packet
>
City Council Packets
>
2010-2019
>
2019
>
09-11-2019 Workshop & Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 1:02:00 PM
Creation date
7/28/2021 2:36:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P UBLIC WORKS DEPARTMENT <br /> <br />Department Overview <br />The Public Works Department provides necessary services to residents, businesses, and visitors by providing <br />well-planned, cost-effective support that promotes public health, personal safety, and economic vitality in a <br />manner that preserves the City’s infrastructure for future generations. <br /> <br />Service Areas <br />• Streets • Storm Water • Garage / Fleet <br />• Public Works Administration • Street Lights • Water (Enterprise Fund) <br />• Snow Removal • Signs • Sewer (Enterprise Fund) <br />• Grading Permits <br /> <br />2020 Departmental Goals <br />• Sweep entire City at least three times with an emphasis on Spring and Fall sweeps. <br />• Evaluate all City streets and seal all cracks. <br />• Perform plowing and de-icing of streets, parking lots, sidewalks, and trials in a safe, timely, and cost <br />effective manner. <br />• Inspect fifteen storm water ponds, all sump structures, 20 rain gardens, and 50 catch basins as part of <br />the Storm Water Pollution Prevention Program. <br />• Continue the Public Works Apprentice program and hire a full-time Apprentice worker in 2020 to create <br />operational efficiencies within the Public Works Department. <br /> <br />Budgetary Commentary <br />Streets - The streets budget includes an additional PW Maintenance I position. One of the directions in the <br />Strategic Plan is to identify staffing needs in order to create operational efficiency. This position was identified <br />as part of this assessment. The City stopped seal coating streets in 2018, and the 2019 Budget was reduced by <br />$48,750 for seal coating activities. In the 2020 Budget, a portion of those savings are requested to be added <br />back into the 2020 Budget for street patching/salt ($6,000), and street striping ($4,000) In addition, $12,500 <br />has been added to the Street Budget for the work crew services. These services are proposed to be budgeted in <br />the Streets Budget instead of the General Capital Improvement Fund budget since these are operating services <br />and not capital services. <br /> <br />Storm – The storm water budget includes funds used in the general maintenance of the storm sewer system. <br />Public Works staff inspects numerous structures, outfalls, ponds, etc. each year and performs routine general <br />maintenance on those that need it. The funds needed fluctuate year-to-year depending on the work that is <br />required. The budget was held at the same amount that it was in 2019. <br /> <br />Garage - Contractual Services have increased for the security camera and Wi-Fi now budgeted in the Garage <br />Budget. <br /> <br />Shade Tree - The budget is the same as the budget last year and includes funds for contracted tree trimming or <br />removal of boulevard trees. Staff is also working on an inventory of potential risks to Ash trees related to the <br />Emerald Ash Borer. <br /> <br /> <br /> <br /> <br /> <br /> <br />DRAFT DOCUMENT 40
The URL can be used to link to this page
Your browser does not support the video tag.