Laserfiche WebLink
Architecture + Engineering + Environmental + Planning ISGInc.com <br />ITEM QTY UNIT COST TOTAL <br />Wood deck with built-in <br />bench seating, overlook, and <br />railing <br />1 LS $23,000.00 $23,000.00 <br />Interpretive sign 2 EA $3,000.00 $6,000.00 <br />Erosion control silt fence 100 LF $3.00 $300.00 <br />Shrubs 70 EA $50.00 $3,500.00 <br />Trees 3 EA $175.00 $525.00 <br />Planting restoration 1 LS $1,000.00 $1,000.00 <br />Permitting 1 LS $1,200.00 $1,200.00 <br /> Subtotal:$35,525.00 <br /> 20% contingency:$7,105.00 <br />GRAND <br />TOTAL $42,630.00 <br />Wood deck - to match existing <br />docks within Gervais Mills Park <br />Relocated interpretive sign <br />& millstone - set on 36” tall <br />concrete plinth <br />New interpretive sign - CHPL <br />material, surface mounted on <br />wood deck <br />Built-in bench - 24” deep with <br />wood back rail <br />Wood deck overlook - with <br />wood guardrails <br />New tree planting - limbed up <br />to accommodate sightlines <br />Improved shrub planting - <br />simple, low maintenance mass <br />planting <br />Striped on-road connection to <br />adjacent trails <br />ALTERNATE OPTION 1 <br />LEGEND <br />Match elevation <br />to ensure ADA <br />Compliance <br />FEET <br />0 8 16 32 <br />N <br />N <br />O <br />E <br />L <br /> <br />D <br />R <br />I <br />V <br />E <br />Design Considerations <br />• Wood decking to match piers in Gervais Mill Park, <br />creating a uniform design vocabulary <br />• Manufactured wood should be considered as a longer- <br />lasting, lower maintenance alternative to natural timber <br />• Built-in wood benches allow for increased seating area <br />• Cut-out allows for a tree to grow out of the deck <br />• Permeable surface under deck and increased planting <br />area allows for water quality improvement <br />GERVAIS <br />CREEK <br />4