Laserfiche WebLink
12316323v3 <br />25 <br />upon the delivery to the Trustee of a Certificate to such effect by the Authorized Borrower <br />Representative. <br />In the event any removal of equipment under this Section causes damage to buildings, the <br />Borrower shall restore or repair such damage at its expense. The Trustee shall execute and <br />deliver as provided in the Indenture such releases or other documents (if any) as the Borrower <br />may properly request in connection with any action taken by the Borrower in conformity with <br />this Section. The removal from the Project Facilities of any portion of equipment pursuant to the <br />provisions of this Section shall not entitle the Borrower to any abatement or diminution of Loan <br />Repayments subsequently due. <br />Section 5.08 Release of Real Property. If no Default exists, the Borrower shall have the <br />right, at any time and from time to time, to a release of Land from the Mortgage, as follows: <br />(i)Land not containing any permanent structure necessary for the total <br />operating unity and efficiency of the Project Facilities may be released for the purpose of <br />selling the same to a third person or to facilitate the construction or financing of additions <br />to the Project Buildings or additional structures not related to the Project on the Land, and <br />the Trustee shall, from time to time, release from the Mortgage such real property so sold, <br />pledged or disposed of, but only upon receipt by the Trustee of the following: <br />(1)A Certificate of an Authorized Borrower Representative setting <br />forth in substance as follows: <br />(A)The number of acres or square feet of the property to be <br />released, <br />(B)The calculation of the release price, which shall be equal to <br />the sale price in the event of a sale to an unaffiliated third party or <br />otherwise shall be equal to [$7.00] per square foot, <br />(C)The property to be released is not needed for the operation <br />of the Project Facilities and is not necessary for the total operating unity <br />and efficiency of the Project Facilities, <br />(D)The release will not impair the structural integrity of the <br />Project Facilities or the usefulness of the Project Facilities for these <br />purposes and will not inhibit adequate means of ingress to or egress from <br />the Project Facilities, <br />(E)No Default exists under this Loan Agreement, and <br />(F)All conditions precedent herein provided for relating to <br />such release have been complied with; <br />(2)A survey prepared by a registered land surveyor describing and <br />showing the Land, after giving effect to such release;