A-7 <br />Demolition of skilled nursing facility activity to start April 2020 <br />Construction begins on The 2020 Project Mid-May 2020 <br />Certificate of Occupancy for The 2020 Project August 2021 <br />Development. The Borrower has entered into a Development Agreement (the “Development Agreement”) <br />with Senior Housing Partners, LLC (“SHP” or the “Developer”), a limited liability company and a wholly owned <br />subsidiary of Presbyterian Homes Housing and Assisted Living, Inc. (“PHHAL”). The principal office and place of <br />business of SHP is 2823 Hamline Avenue North, Roseville, MN 55113. Total compensation payable to SHP under <br />the Development Agreement is $1,357,000 and will be paid 50% upon the issuance of the Series 2020 Bonds and <br />50% in installments during the 2020 Project construction. <br />Under the Development Agreement, the Developer will be responsible for the following items with respect <br />to the Project: <br />Design and Planning. The Developer will assist the Borrower and the architect in determining the basic <br />requirements and final plans for the Campus, including type of building, floor plan layout, space utilization, <br />equipment needed, estimates of improvement costs, necessary land use approvals, utility connections, and other site <br />preparations and planning. <br />Architect. The Architect for the Project is Pope Architects (the “Architect”). The Architect was founded in <br />1974 and currently serves a wide array of markets locally and nationally. The Architect has extensive experience in <br />Senior and Multi-Family Housing, Community, Education, Corporate and Industrial, Retail, and Healthcare markets. <br />Construction. AP Midwest, LLC, a Minnesota limited liability company based in Minneapolis, Minnesota <br />(the “Contractor”), is the general contractor for the 2020 Project and commonly known as Adolfson & Peterson <br />Construction. The Contractor has been in business since 1945. The Contractor’s project teams have extensive <br />experience in senior housing, and the Contractor has worked with PHS and its affiliates on multiple recent projects. <br />The Contractor was also the general contractor for the 2018 Project. <br />Below is a list of recent projects where the Contractor worked on PHS projects: <br />Project <br />Name Location <br />Number of <br />Assisted <br />Living <br />Apartments <br />Number of <br />Independent <br />Living <br />Apartments <br />Number of <br />Transitional <br />Care <br />Units/Beds <br />Year <br />Opened <br />Project <br />Size in <br />Millions <br />Folkstone Wayzata <br />The Developer will work with the Borrower and the Contractor to construct and equip the 2020 Project <br />according to the drawings, plans, and specifications adopted. The Developer will work with the Borrower and the <br />Architect in obtaining bids or negotiated proposals and in awarding and preparing construction agreements. The <br />Borrower shall enter into appropriate agreements with contractors or other parties for construction, equipping, and <br />furnishing of the 2020 Project. The agreements are guaranteed maximum contracts in a total sum acceptable to the <br />Borrower and within the established construction cost estimates for the 2020 Project. During construction, the <br />Developer will make periodic visits to the site and consult with the Borrower, the Contractor and the Architect in <br />coordinating construction activities as scheduled. The Developer will assist the Borrower in obtaining all necessary <br />municipal approvals for the 2020 Project. The Developer will coordinate construction draws for the Borrower. <br />The construction contract with the Contractor for the construction of the 2020 Project (the “Construction <br />Contract”) has a Guaranteed Maximum Price (the “GMP”) of $[24,047,100]. Although it is expected that the