Laserfiche WebLink
SCHEDULE 3.0 - BURKE LANE/CONDIT STREET - TOTAL $56,840.56 $250,864.75 <br />SCHEDULE 4.0 - IONA LANE DRAINAGE SWALE <br />1 2021.501 MOBILIZATION LS 1.00 $3,800.00 0.00 $0.00 0.00 $0.00 <br />2 2104.501 REMOVE CONCRETE CURB LF 20.00 $15.80 0.00 $0.00 0.00 $0.00 <br />3 2104.511 SAW CUT CONCRETE (FULL DEPTH) LF 5.00 $47.05 0.00 $0.00 0.00 $0.00 <br />4 2105.601 SITE GRADING LS 1.00 $1,306.60 0.00 $0.00 0.00 $0.00 <br />5 2531.501 CONCRETE CURB & GUTTER LF 20.00 $22.11 0.00 $0.00 0.00 $0.00 <br />6 2575.604 SOD SY 100.00 $10.53 0.00 $0.00 0.00 $0.00 <br />SCHEDULE 4.0 - IONA LANE DRAINAGE SWALE - TOTAL $0.00 $0.00 <br />SCHEDULE 5.0 - BOSS ROAD POND INLET <br />1 2021.501 MOBILIZATION LS 1.00 $3,800.00 0.00 $0.00 1.00 $3,800.00 <br />2 2104.501 REMOVE CONCRETE CURB LF 15.00 $21.06 0.00 $0.00 16.00 $336.96 <br />3 2104.505 REMOVE BITUMINOUS PAVEMENT SY 10.00 $13.07 0.00 $0.00 0.00 $0.00 <br />4 2104.513 SAW-CUT BITUMINOUS (FULL DEPTH) LF 25.00 $7.30 0.00 $0.00 0.00 $0.00 <br />5 2104.523 SALVAGE SIGN EACH 1.00 $36.85 0.00 $0.00 0.00 $0.00 <br />6 2231.604 BITUMINOUS PATCH SPECIAL SY 10.00 $81.71 0.00 $0.00 4.00 $326.84 <br />7 2503.511 12" PVC SCH 40 STORM SEWER LF 95.00 $34.75 0.00 $0.00 74.00 $2,571.50 <br />8 2506.502 CONST. DRAINAGE STRUCTURE DESIGN SPEC. 24 X 36 EACH 1.00 $3,006.85 0.00 $0.00 1.00 $3,006.85 <br />9 2511.501 RANDOM RIP RAP CL III CY 7.00 $94.77 0.00 $0.00 5.00 $473.85 <br />10 2531.501 CONCRETE CURB & GUTTER LF 15.00 $22.11 0.00 $0.00 16.00 $353.76 <br />11 2564.602 INSTALL SALVAGED SIGN EACH 1.00 $78.97 0.00 $0.00 0.00 $0.00 <br />12 2575.602 SITE RESTORATION LS 1.00 $789.74 0.00 $0.00 1.00 $789.74 <br />SCHEDULE 5.0 - BOSS ROAD POND INLET - TOTAL $0.00 $11,659.50 <br />SCHEDULE 6.0 - COUNTRY DRIVE <br />1 2021.501 MOBILIZATION LS 1.00 $3,950.00 0.00 $0.00 1.00 $3,950.00 <br />2 2506.602 RECONSTRUCT DRAINAGE STRUCTURE EACH 1.00 $8,423.92 0.00 $0.00 1.00 $8,423.92 <br />3 2563.601 TRAFFIC CONTROL LS 1.00 $1,000.00 0.00 $0.00 1.00 $1,000.00 <br />4 2575.602 SITE RESTORATION LS 1.00 $789.74 0.00 $0.00 1.00 $789.74 <br />SCHEDULE 6.0 - COUNTRY DRIVE - TOTAL $0.00 $14,163.66 <br />SCHEDULE 7.0 - GERVAIS MILL PARK <br />1 2021.501 MOBILIZATION LS 1.00 $3,984.24 0.00 $0.00 1.00 $3,984.24 <br />2 2104.523 SALVAGE PARKING STOP EACH 7.00 $97.33 0.00 $0.00 6.00 $583.98 <br />3 2112.604 BASE PREPARATION SY 480.00 $2.65 0.00 $0.00 480.00 $1,272.00 <br />4 2215.504 FULL DEPTH RECLAMATION SY 480.00 $4.21 0.00 $0.00 480.00 $2,020.80 <br />5 2360.501 TYPE SP 9.5 WEARING COURSE MIX. TON 45.00 $96.62 0.00 $0.00 57.89 $5,593.33 <br />6 2360.501 TYPE SP 12.5 NONWEARING COURSE MIX. TON 60.00 $96.05 0.00 $0.00 66.07 $6,346.02 <br />7 2531.501 CONCRETE CURB & GUTTER (B618) LF 160.00 $22.11 0.00 $0.00 165.00 $3,648.15 <br />8 2531.501 CONCRETE CURB & GUTTER (SURMOUNTABLE) LF 35.00 $22.11 0.00 $0.00 30.00 $663.30 <br />9 2554.503 INSTALL SALVAGED PARKING STOP EACH 7.00 $97.33 0.00 $0.00 6.00 $583.98 <br />10 2563.601 TRAFFIC CONTROL LS 1.00 $1,000.00 0.00 $0.00 1.00 $1,000.00 <br />11 2564.531 F & I SIGN PANEL SF 2.00 $36.86 0.00 $0.00 2.00 $73.72 <br />12 2564.602 F & I SIGN POST EACH 1.00 $57.91 0.00 $0.00 1.00 $57.91 <br />13 2573.502 SILT FENCE TYPE MACHINE SLICED LF 150.00 $2.32 0.00 $0.00 190.00 $440.80