My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-2020 Council Packet
>
City Council Packets
>
2020-2029
>
2020
>
06-10-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 2:51:09 PM
Creation date
1/13/2022 2:37:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Little Canada 8-10 Water Supply Plan <br />23BWellhead Protection (WHP) and Surface Water Protection (SWP) Plans <br />24BTable 8-10. Status of Wellhead Protection and Surface Water Protection Plans <br />Plan Type Status Date Adopted Date for Update <br />WHP ☐ In Process <br />☐ Completed <br />☒ Not Applicable <br /> <br />SWP ☐ In Process <br />☐ Completed <br />☒ Not Applicable <br /> <br />25BCapital Improvement Plan (CIP) <br />Please note that any wells that received approval under a ten-year permit, but that were not <br />built, are now expired and must submit a water appropriations permit. <br />26BAdequacy of Water Supply System <br />27BTable 8-11. Adequacy of Water Supply System <br />System Component Planned action Anticipated <br />Construction <br />Year <br />Notes <br />Wells/Intakes ☒ No action planned - <br />adequate <br />☐ Repair/replacement <br />☐ Expansion/addition <br /> <br />Water Storage Facilities <br /> <br />☐ No action planned - <br />adequate <br />☒ Repair/replacement <br />☐ Expansion/addition <br />2034 Water Tower <br />Rehab <br />Water Treatment Facilities ☒ No action planned - <br />adequate <br />☐ Repair/replacement <br />☐ Expansion/addition <br /> <br />Distribution Systems <br />(pipes, valves, etc.) <br />☒ No action planned - <br />adequate <br />☐ Repair/replacement <br />☐ Expansion/addition <br /> No plans to <br />upgrade any pipe <br />or <br />appurtenances. <br />Only repair parts <br />that leak or <br />otherwise need <br />repairing <br />Pressure Zones ☒ No action planned - <br />adequate <br />☐ Repair/replacement <br />☐ Expansion/addition <br /> <br />Other: ☐ No action planned - <br />adequate <br />☐ Repair/replacement <br />☐ Expansion/addition <br />
The URL can be used to link to this page
Your browser does not support the video tag.