My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2020 Workshop Packet
>
City Council Packets
>
2020-2029
>
2020
>
10-14-2020 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:37:56 PM
Creation date
1/13/2022 3:09:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECTS BY YEAR (PAGES 12-18) <br />A detailed listing of projects by year is located on pages 12-18. 2021 projects will be included in the 2021 <br />Budget that will be adopted by Council in December. The 2022-2025 projects should be considered a <br />planning tool, and the projects included for 2021 will serve as a work plan for staff. <br /> <br />PROJECTS BY TYPE (PAGES 19-31) <br />Projects have been classified as: <br />• Buildings (except the fire station) <br />• Administration <br />• Fire <br />• Parks & Recreation <br />• Public Works Equipment <br />• Streets <br />• Trails <br />• Storm <br />• Water and Sewer <br /> <br />2021 highlights by project type and significant future projects are as follows: <br />Buildings (Page 19) <br />Highlights of building improvements in the Capital Projects budget include: <br />• Upgrades at the City Center for $97,300. This includes windows, doors, efficiency upgrades and <br />preliminary costs for staff bathroom upgrades. <br />• Miscellaneous office furniture and reconfiguration of the front office space at the City Center <br />(Preliminary estimate of $8,000) <br /> <br />Administration (Page 20) <br />The City of Little Canada has traditionally required administrative employees to utilize their private <br />vehicles for inspection activities. While employees are reimbursed for their mileage expenses, they are <br />not readily identifiable as a City employee. This also creates additional liability issues when conducting <br />official city business in a private vehicle. Staff is recommending that up to $23,000 be included in the <br />2021 Capital Projects budget for the purchase of a small all-wheel drive SUV. The vehicle would be used <br />primarily for rental licensing and code enforcement inspections, but could also be utilized by other <br />administrative staff for meetings or conferences when needed. This amount was included in the 2020 <br />projects but not purchased, due the delay in the hiring of the Code Enforcement Officer. <br />Additional capital project expenditures in the Administration Department include standard computer and <br />network switch upgrades ($12,450) and replacement phones ($5,000). The current phones will not be <br />supported after 2021. <br />Fire (Page 21) <br />Fire equipment has traditionally been funded by the General Capital Improvement Fund (400) and the Fire <br />Equipment Fund (457). The City levies $160,000 in property taxes for fire equipment in the Fire Equipment <br />Fund. There should be discussion whether all fire equipment purchases after 2021, should be included <br />in the Fire Equipment Fund (457). <br /> <br />2021 fire equipment to be replaced include the fire radios ($192,000), and the 3rd Command Vehicle <br />($63,700). The other two Command Vehicles were replaced in 2019 and 2020. As has been done in the <br />past, the reserve line ($40,200) is included in the 2021 capital as requested by the LCFD. These funds will <br />only be utilized if there is an unforeseen capital emergency. 3DRAFT DOCUMENT 10-09-2020
The URL can be used to link to this page
Your browser does not support the video tag.