Laserfiche WebLink
• Continued work on habitat restoration at Thunder Bay/Westwind Park following the Xcel clear <br />cutting from 2018 <br /> <br />Looking past 2021, some highlights of upcoming projects are: <br />• Boardwalk in Gervais Mill Park <br />• Boardwalk/Pier at Nadeau Wildlife Park <br />• Upgrade Band Shell at Spooner Park <br />• Pioneer Park Playground equipment (transfer from Park Land Acquisition Fund 456) <br />• Picnic shelter at Rondeau Park <br />• Fitness Equipment in the Thunder Bay/Westwind Park (contingent on grant funding) <br /> <br />Public Works Equipment (Pages 24-25) <br />Due to the large replacement cost for public works equipment, all major equipment has been included in <br />the schedule. If a piece of equipment will not be replaced in the next five years, the anticipated <br />replacement cost is identified in the future column. <br /> <br />Highlights of the 2021 Public Works Department equipment purchases are as follows: <br />The 2011 Ford F-250 is scheduled to be replaced in 2021. The truck has over 60,000 miles on it and is <br />used for plowing cul-de-sacs in the winter. Plowing is hard on trucks, particularly the transmission. The <br />truck was also involved in an accident back in 2012 and the back passenger quarter panel had to be <br />replaced. The replacement panel is already rusting and it is not from a lack of proper care. Staff is not <br />sure what the issue is. This truck serves as the utility truck and is in use each day for such work as <br />locating sewer and water utilities, checking lift stations, meter replacement, and other day-to-day <br />activities. The new truck will also have a plow, as it will serve as a plow truck on the east side of the City. <br />The estimated cost of the new truck and plow is $50,000. <br />The 2011 GMC pickup will be replaced as well. This truck is used in parks maintenance and also will <br />have a plow for plowing parking lots and trails and helping out with cul-de-sacs as needed. The current <br />truck has 41,000 miles on it and also has hard use from plowing and off road travel in the parks. The <br />plow had to be repaired last year and the truck has had some electrical problems in the past year. The <br />estimated cost of the truck and plow is $48,000. <br />The 2013 Toolcat is scheduled to be replaced in 2021 for $56,000. The Toolcats are used all year for <br />such activities as mowing boulevards, plowing sidewalks, maintaining off road areas, and hauling <br />materials to difficult- to reach areas. <br />Small Equipment: <br />• Snowblower ($2,750): The 2001 Toro snowblower is scheduled to be replaced. It is used to blow <br />sidewalks around City Hall and the Fire Station and around lift stations and other areas. <br />• Jumping Jack Compactor ($2,000): The jumping jack compactor is used to compact backfill in <br />holes that are excavated. <br />The Public works Department will continue to follow the replacement schedule for identifying trucks <br />and equipment to be considered for replacement. As in the past, once a truck or piece of equipment is <br />identified, an analysis is completed to see if the item needs to be replaced per the replacement schedule <br />or can be deferred to a future year. <br />5DRAFT DOCUMENT 10-09-2020