Laserfiche WebLink
Year Project Type Location Description Cost Project Description <br />CITY OF LITTLE CANADA <br />CAPITAL PROJECTS <br />2022 Projects <br />2022 Trails Appraisal future trails 5,000 <br />2022 Trails Land and demolition of property 250,000 <br />Funded with Park Land Acquisition (Fund 456)310,000 <br />2022 Fire Aerial truck 1,352,000 Replace 1992 truck <br />Funded with Fire Equipment Replacement Fund (Fund 457)1,352,000 <br />2022 Water/Sewer Water meter gateway & software 8,000 <br />2022 Water/Sewer Sewer machine hose 2,100 <br />2022 Water/Sewer Rice Street valve repair 60,000 <br />2022 Water/Sewer Force main-Dianna Lane 150,000 <br />2022 Water/Sewer Manhole repairs 100,000 <br />2022 Water/Sewer Paint hydrants 12,500 <br />2022 Water/Sewer Lining sanitary 50,000 Slip lining <br />2022 Water/Sewer Misc. line repairs 50,000 <br />2022 Water/Sewer Lift Station-Controller 17,000 <br />2022 Water/Sewer Lift Station-Upgrades 10,000 <br />Funded with Water/Sewer Replacement Fund (Fund 604)459,600 <br />Total 2022 Projects 4,203,350$ <br />15DRAFT DOCUMENT 10-09-2020