Laserfiche WebLink
Proposal for the Establishment of a Stormwater Utility <br />6/19/2019 <br />Page: 6 <br /> <br /> <br /> <br />FEES <br />We propose to complete the above work described in the Scope of Services for an hourly not-to-exceed <br />fee of $45,000. This fee includes all work described in Tasks 1 through 10 above and includes 7 separate <br />meetings as listed below. <br /> <br />• 1 Kickoff meeting <br />• 3 City staff/Committee meetings <br />• 2 City Council meetings (includes a public hearing) <br />• 1 Public educational meeting/presentation, if requested <br /> <br />If more meetings are required, our services will be provided at our regular hourly rates for the individuals <br />required to be in attendance. <br /> <br />Client: City of Little Canada Bolton & Menk, Inc. <br />Project: Establishment of a Stormwater Utility <br />Task <br />No. Work Task Description City Engineer Water Resources Engineer Water Resources Design Engineer GIS Technician Clerical Total <br />Hours <br />Total <br />Cost <br /> <br />1.0 Project Meetings and Communication 16 28 0 0 0 44 $5,000 <br />2.0 List Activities to be Funded 0 8 0 0 0 8 $1,100 <br />3.0 Calculate Impervious Areas 0 2 8 150 0 160 $18,400 <br />4.0 Present Spreadsheet Calculations and Pricing 0 8 12 0 0 20 $2,400 <br />5.0 Prepare Draft Stormwater Utility Justification Report 4 32 8 0 2 46 $5,700 <br />6.0 Prepare Final Stormwater Utility Justification Report 2 8 0 0 0 10 $1,200 <br />7.0 Prepare Final Stormwater Utility Ordinance 2 14 0 0 2 18 $2,200 <br />8.0 Develop Educational Materials 2 12 12 0 4 30 $3,400 <br />9.0 Finalize Stormwater Utility Rate Database 4 10 0 12 0 26 $3,100 <br />10.0 Develop Administrative Processes 4 16 0 0 0 20 $2,500 <br /> Total Hours 34 138 40 162 8 382 <br /> <br /> Total Fee $45,000 <br /> <br />TIME LINE <br />Bolton & Menk is ready to begin this work immediately after receiving your acceptance of this proposal. <br />Based on the rigorous public meeting schedule and the mandatory timelines, we believe that this process <br />could take from 6 months to 1 year depending on the response times of the many committee members and <br />various parties that are not under Bolton & Menk control.