My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-2020 Council Packet
>
City Council Packets
>
2020-2029
>
2020
>
11-18-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:37:56 PM
Creation date
1/13/2022 3:29:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Year Project Type Location Description <br />Project Form <br />Page #Cost Project Description <br />CITY OF LITTLE CANADA <br />CAPITAL PROJECTS <br />2021 Projects <br />2021 Public Works Equipment PW Truck with plow 47 50,000 Replace 2011 Ford F250 (unit 111) <br />2021 Public Works Equipment PW Truck 48 48,000 Replace 2011 GMC 2500 (unit 311) <br />2021 Public Works Equipment Toolcat with lift attachment 49 56,000 Replace 2013 Toolcat (unit 112) <br />2021 Public Works Equipment Mower 7 foot 12,500 Replace 2016 Toro-z-turn mower <br />2021 Public Works Equipment Generator rehab 10,000 Not completed in 2020; move to 2021 <br />2021 Public Works Equipment LELY spreader 5,000 Not completed in 2020; move to 2021 <br />2021 Public Works Equipment Snowblower 2,750 Replace 2001 Snowblower <br />2021 Public Works Equipment Field Drags 5,000 <br />2021 Public Works Equipment Plow for toolcat 2,000 <br />2021 Public Works Equipment Jumping jack compactor 2,000 <br />2021 Public Works Equipment Enclosed trailer 3,800 <br />Funded with General Capital Improvements (Fund 400)1,276,350 <br />2021 Streets Greenbrier Circle (Cnty Rd B2 to end)512,300 Reconstruction with new curb <br />2021 Streets Old Country Road C 631,750 Reconstruction with new curb <br />2021 Streets S Owasso RR Crossing 35,000 Partnership with RR/$35,000 is city portion <br />2021 Storm Pond cleanout 15,000 <br />Funded with Infrastructure Capital Improvements (Fund 450)1,194,050 <br />2021 Trails Trout Brook Regional Trail 7,500 City Portion <br />2021 Park Land Plan for trail connections 15,000 <br />2021 Park Land Appraisals for future trails 5,000 <br />Funded with Park Land Acquisition (Fund 456)27,500 <br />2021 Fire Command vehicle 50 63,700 <br />Funded with Fire Equipment Replacement Fund (Fund 457)63,700 <br />2021 Water/Sewer Vac unit 51 22,000 <br />2021 Water/Sewer Lining sanitary 25,000 Slip lining <br />2021 Water/Sewer Misc. line repairs 52 40,000 <br />2021 Water/Sewer Lift Station-Controller 53 30,000 <br />2021 Water/Sewer Lift Station-Upgrades 10,000 <br />2021 Water/Sewer Woodlyn Lift Station-Pumps 54 16,000 <br />Funded with Water/Sewer Replacement Fund (Fund 604)143,000 <br />Total 2021 Projects 2,704,600$ <br />13
The URL can be used to link to this page
Your browser does not support the video tag.