My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
01-13-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 4:05:19 PM
Creation date
1/31/2022 3:30:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM <br />BILL DIRCKS <br />PUBLIC WORKS DIRECTOR <br />Mr. Dircks oversees the City’s <br />engineering and public works <br />maintenance activities. He <br />provides direction for long- <br />term infrastructure planning <br />through the City’s Capital <br />Improvement Plan (CIP). <br />MARK KASMA <br />CITY ENGINEER <br />Mr. Kasma serves as the City <br />Engineer for Little Canada. He <br />is responsible for the quality <br />assurance and quality control <br />on City infrastructure <br />improvements. <br />ERIC SEABURG <br />PROJECT MANAGER <br />Mr. Seaburg is responsible for <br />project scoping, preliminary <br />and final design, bidding, <br />construction administration, <br />and budget/schedule control. <br />ALISA GERHOLD <br />PROJECT DESIGNER <br />Alisa Gerhold is responsible for <br />preparation of construction <br />documents, cost estimating, <br />permitting and oversees <br />construction activities to <br />ensure conformance with the <br />plans and specifications. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.