My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-24-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
03-24-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 4:05:19 PM
Creation date
1/31/2022 3:51:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
easier use of the room as a stand-alone meeting room. <br /> Cost: ~$4,500 <br /> Timeline: 1-2 weeks <br /> Priority: Low <br /> Next Steps: Develop plans and specifications with NineNorth <br /> <br />2. Control Room Reconfiguration/System Simplification <br />Description: Move rack from control room to storage room behind control room. <br /> Why: Moving the rack location would clear the sightlines through the <br />window from the council to the operator. It would also cleanup and <br />simplify system wiring. <br /> Cost: $3,000 <br /> Timeline: 1-2 weeks <br /> Priority: Low <br /> Next Steps: Authorize NineNorth <br /> <br />3. Add Static Wide Shot <br />Description: Add additional camera, a wide shot of the council, to the system. <br /> Cost: $1,750 <br /> Why: The addition of a relatively inexpensive “wide” camera would <br />enhance production quality. Currently one of the more <br />expensive pan/tilt/zoom (PTZ) cameras is used to provide this <br />single shot. The additional of a fixed camera would provide <br />this shot more economically and allow for the PTZ camera to <br />be used for additional closeups. <br /> Cost: $1,750 <br /> Timeline: <1 week <br /> Priority: Medium <br /> Next Steps: Authorize NineNorth <br /> <br />PJC/pjc <br />
The URL can be used to link to this page
Your browser does not support the video tag.