My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
02-09-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 3:14:57 PM
Creation date
2/9/2022 3:14:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Keis and Members of the City Council <br /> <br />FROM: Eric Seaburg, P.E., City Engineer <br /> <br />DATE: February 9, 2022 <br /> <br />RE: Approval of Plans and Specifications for 2022 Street Improvements <br /> <br /> <br />ACTION TO BE CONSIDERED: <br />Motion to approve plans and specifications and ordering advertisement for bids for street <br />improvements on: <br />• Yorkton Ridge (from Condit Street to end of cul-de-sac) – Project 2022-02 <br />• Maple Lane & Jackson Street (from end of cul-de-sac to Labore Ave) – Project 2022-03 <br />• Ryan Drive (Spruce Street to Country Drive) – Project 2022-04 <br />• Woodlynn Avenue (Rice Street to east terminus) – Project 2022-05 <br /> <br />BACKGROUND: <br />Project staff has been working over the last several months to develop these projects, coordinate <br />with impacted residents and property owners, and prepare final plans for bidding. The scope of <br />improvements varies between the project areas. <br /> <br />• Yorkton Ridge: Full depth reclamation with spot utility improvements <br />• Maple Lane & Jackson Street: Full depth reclamation with spot utility improvements <br />• Ryan Drive: 2” mill and overlay with storm sewer and sanitary sewer installation <br />• Woodlynn Ave (west of tracks): 2” mill and overlay with spot storm sewer improvements <br />• Woodlynn Ave (east of tracks): Full reconstruction with spot utility improvements <br /> <br />On December 15, 2021, the City Council directed the City Engineer to prepare plans and <br />specifications for street improvements on Yorkton Ridge & Maple Lane – Jackson Street. <br /> <br />On January 10, 2022, the City Council directed the City Engineer to prepare plans and <br />specifications for street improvements on Ryan Drive & Woodlynn Avenue. <br /> <br />The table on the next page identifies the current estimated project costs, itemized by <br />improvement type, with project contingency and indirect costs included. Once bids are received, <br />this table will be updated with low-bid contractor pricing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.